Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
176
FIGURE 10-3: Removing the pneumatic pilot lines
1. Pneumatic pilot lines
2. Contact pressure gauge
3. Pressure gauge connections
4. Remove the pneumatic pilot lines from the valves on the extinguishing agent containers.
5. Screw the plugs into all sequence valve connections and control connections and tighten
with a torque of 12 ± 1 Nm (8.85 ± 0.74 ft-lb).
6. Remove the electrical connections for the contact pressure gauge.
7. Release the contact pressure gauge with a suitable tool on the size 14 flat wrench and as
soon as it can be easily turned, unscrew from the valve by hand.
8. Secure all contact pressure gauge connections with plugs at the valves.
The pressure relief can, due to the system, result in a brief, hazard-free ‘pop’ noise.
Summary of Contents for Oxeo
Page 1: ...Installation and Maintenance Manual Oxeo Inert Gas Extinguishing System...
Page 10: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 4...
Page 32: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 26...
Page 42: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 36...
Page 134: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 128...
Page 148: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 142...
Page 156: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 150...
Page 176: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 170...
Page 206: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 200...
Page 220: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 214...
Page 221: ...Oxeo PR LCP 10 2022 en 215 15 SafetyDataSheet IG 01 Argon...
Page 228: ...Oxeo PR LCP 10 2022 en 222...
Page 229: ...Oxeo PR LCP 10 2022 en 223 16 SafetyDataSheet IG 100 Nitrogen...
Page 236: ...Oxeo PR LCP 10 2022 en 230...
Page 237: ......