Inst. and Maint. Manual | Oxeo PR LCP | F_101921 Rev 02 | 10-2022 | en
ii
Table of Contents
4.8 Pilot hoses for activation of “slave” cylinder ....................
4.9 Monitored blocking...................................................................
4.10 Pressure reducer ......................................................................
4.11 Manifold safety valve..............................................................
4.12 Occupiable space protection kit ........................................
4.13 Shuttle non-return valve .......................................................
4.14 Pilot pressure relief assemblies...........................................
4.15 Blocking device, pilot line.....................................................
4.16 Downstream pipework ..........................................................
4.17 Limit switch, pneumatically operated..............................
4.18 VN Nozzle....................................................................................
4.19 DCM Nozzle................................................................................
4.20 Pilot line made of precision steel pipe.............................
5 Assembly and installation................................................
5.1 Warnings for assembly and installation.............................
5.2 Requirements imposed on the pipeline system .............
5.3 Manifold Assembly ....................................................................
5.4 Extinguishing cylinder with quick release valve QRV ...
5.5 Installing the safety valve........................................................
5.6 Mounting the pilot control cylinder....................................
5.7 Assembling the shuttle non-return valve..........................
5.8 Mounting flexible pilot hose..................................................
5.9 Assembling the pilot pressure relief device .....................
5.10 Mounting the blocking device............................................
5.11 Mounting the pressure reducer..........................................
5.12 Mounting the pneumatic time delay ...............................
5.13 Assembling the downstream pipework ..........................
5.14 Assembling the pneumatically operated limit switch
5.15 Mounting the VN Nozzle.......................................................
5.16 Mounting the pilot line made of precision steel pipe
5.17 Mounting makrofon MX-1....................................................
Summary of Contents for Oxeo
Page 1: ...Installation and Maintenance Manual Oxeo Inert Gas Extinguishing System...
Page 10: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 4...
Page 32: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 26...
Page 42: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 36...
Page 134: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 128...
Page 148: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 142...
Page 156: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 150...
Page 176: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 170...
Page 206: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 200...
Page 220: ...Inst and Maint Manual Oxeo PR LCP F_101921 Rev 02 10 2022 en 214...
Page 221: ...Oxeo PR LCP 10 2022 en 215 15 SafetyDataSheet IG 01 Argon...
Page 228: ...Oxeo PR LCP 10 2022 en 222...
Page 229: ...Oxeo PR LCP 10 2022 en 223 16 SafetyDataSheet IG 100 Nitrogen...
Page 236: ...Oxeo PR LCP 10 2022 en 230...
Page 237: ......