30
7602050
FIG.53
FIG.54
FIG.55
FIG.56
lV.
Press any button on one handset and the yellow
light will go out.
V.
Programming is complete.
7.5-
Test that the handsets have been programmed
correctly by pressing the up and down button on each
and check that the lift moves in the corresponding
direction.
Fitting the handset holder
1-
Fit the hand control holder to the wall in the required
position using the fixings supplied (Fig. 57).
NOTE:
The handset can be fixed into the holder by
inserting the supplied plastic locking section.
8) TESTING
Items required:
-Handsets
Tools required:
-None
8.1-
Ensure that all of the safety edges on the power
pack are functioning (see Fig. 58):
a-
Drive the lift in the up direction.
b-
Press the top safety edge – the lift should stop.
c-
Drive the lift in the down direction.
d-
Press the bottom safety edge – the lift should stop.
FIG.57