7602116
ONLY FOR STOCK GUIDE:
- Pass the power supply cable inside the spiral
tube and fix with the proper fairlead to the lid by
the top side of the guide (after having removed the
feather of the down side of the lid) (Fig.9/e).
- Drill with Ø 6 the chain carriage profile close to
the guide connection and fix with the proper self-
threading screws 4,8x13 (Fig. 9/c).
3) INSTALLING THE CARRIAGE
- Bring the carriage unit to the upper floor then remove
the mechanical limit stop buffer on the top end of the
rail.
- Assemble the cover and the plate with the proper self-
threading screws 4,8x13, on the guide at high side.
- Fix the cable carriage plate to the carriage (facing in
the down direction) using suitable screws (Fig. 12/c).
- At this point, check that the safety gear hook is hori-
zontal (Fig. 12/e) and that the pins (Fig. 12/a - Fig. 12/b)
are vertically aligned (using a spirit level).
N.B.: Each system will carry a card listing the ope-
rations to be carried out.
- Engage the safety gear hook to prevent undesirable
movements when the lift structure is fitted.
4) COMPLETE ACTUATOR ASSEMBLY
1) Assemble the actuator (Fig. 13/a) with nut (Fig. 13/b),
washer (Fig. 13/c) and friction (Fig. 13/d) paying atten-
tion that the release friction must result opposite to the
machine and check the quote 271 mm (vedi Fig. 13)
when the actuator is closed (therefore on the opposite
side of the micros of the actuator itself).
2) On the support (fork) insert the two rubber pieces
(vibration-damping) (Fig. 14/b), then screw the actua-
tor (Fig. 14/e) with a TE M10x90 screw (Fig. 14/a), a
Ø UNI 6593 washer (Fig. 14/c) and M10 self-locking
nut (Fig. 14/d) (it is advisable doing this before as the
frame is obstructing the field).
Please Note: screw till placing the rubber spacers
at support level.
3) Screw into the frame (on the machine low side) (Fig.
15/c) with M10x30 screw (Fig. 15/a) and Ø 10 washer
(Fig. 15/b).
4) Release the friction (Fig. 16/a).
5) Bring the friction tube (Fig. 17/a) at the same level
as the support holes (Fig. 17/b) and fix with TE M8x50
screw (Fig. 17/c) and thread-locking adhesive.
5) FITTING THE LIFT BODYWORK
- Bring the lift bodywork towards the carriage, trying to
align it with the carriage sprocket.
- Connect the connectors of the cable carrier chain
driver:
(blue cable 4 x 1 for power supply)
(green cable 8 x 0,35 for control board) (optional)
FIG.12
FIG.13
FIG.14
19
a
e
b
f
g
d
h
c
a
b
c
d
b
b
e
a
c
c
d
274
0 -0,5
Summary of Contents for V64-74 B.I.
Page 37: ...37 7801228 BARRE DI SICUREZZA...
Page 40: ...40 7801229 BARRE DI SICUREZZA RETRATTILI...
Page 43: ...43 7801230 PROTEZIONI SOLO PER MOD V64 SOLO PER MOD V74...
Page 45: ...45 6 9 8 7 10 4 2 1 7 7 1 2 11 13 12 1 2 5 3 7801231 GUIDA...
Page 47: ...47 3 7801232 1 4 5 6 7 8 8 2 14 12 9 10 11 13 6 PANNELLO ELETTRICO B I...
Page 51: ...51 7804457 1 2 3 4 CAVI AZIONAMENTO PEDANA BANDELLA BARRE INDIPENDENTI BARRE RETRATTILI...