Manual VIPA HMI
Chapter 3 Installation Guidelines
HB160E - TP - RE_612-1BC00 - Rev. 08/37
3-5
In critical cases you should implement special EMC measures!
•
Connect snubber networks to all inductive loads that are not controlled
by special EMC modules.
•
Use incandescent lamps for illumination purposes inside cabinets or
cubicles, do not use of fluorescent lamps.
Create a single reference potential and ensure that all electrical
equipment is grounded wherever possible!
•
Ensure that grounding measures are implemented effectively. The
controllers are earthend to provide protection and for functional reasons.
•
Provide a star-shaped connection between the plant, cabinets/cubicles
and the grounding/ protection system. In this way you can avoid ground
loops.
•
Where potential differences exist you must install sufficiently large
equipotent bonding conductors between the different parts of the plant.
Summary of Contents for 612-1BC00
Page 2: ...Lerrzeichen...
Page 6: ...Contents Manual VIPA HMI ii HB160E TP RE_612 1BC00 Rev 08 37...
Page 20: ...Chapter 1 Hardware description Manual VIPA HMI 1 12 HB160E TP RE_612 1BC00 Rev 08 37...
Page 48: ...Chapter 2 Deployment Touch Panel Manual VIPA HMI 2 28 HB160E TP RE_612 1BC00 Rev 08 37...
Page 62: ...Index Manual VIPA HMI A 2 HB160E TP RE_612 1BC00 Rev 08 37 M Stich...