background image

 Water  Chemistry:

Water quality is extremely important for the optimum performance of your UV 

system. The following levels are recommended for installation:

  Iron: < 0.3 ppm (0.3 mg/L)

  Hardness*: < 7 gpg (120 mg/L)

  Turbidity: < 1 NTU

  Manganese: < 0.05 ppm (0.05 mg/L)

  Tannins: < 0.1 ppm (0.1 mg/L)

  UV Transmittance: > 75% (call factory for recommendations on 

applications where UVT < 75%)

*  Where total hardness is less than 7 gpg, the UV unit should operate efficiently 

provided the quartz sleeves are cleaned periodically. If total hardness exceeds 

7 gpg, the water should be softened. If your water chemistry contains levels in 

excess of those mentioned above, proper pre-treatment is recommended to correct 

these water problems prior to the installation of your UV disinfection system. These 

water quality parameters can be tested by your local dealer, or by most private 

analytical laboratories. 

Proper pre-treatment is essential for the UV disinfection 

system to operate as intended.

 Installing your UV Disinfection System:

•  

CAUTION

, power cord on ballast enclosure must be connected to a grounded 

receptacle and the lamp connector ground wire connected to the stainless steel 

reactor chamber.

•  The disinfection system is designed to be mounted horizontally within the main 

plumbing lines. 

•  The enclosure should be mounted either above or beside the reactor chamber. 

Never mount vertically with AC connector at top of ballast to prevent moisture from 

running down cordage and causing a potential fire hazard. Drip loops in all cordage 

connected to ballast controller is highly recommended (see figure 1D).

•  The complete water system, including any pressure or hot water tanks, must be 

sterilized before start up by flushing with chlorine (household bleach) to destroy any 

residual contamination.

•  For safety purposes, the disinfection system should be connected to a ground fault 

interrupt circuit.

•  The disinfection system is intended for indoor use only, do not install disinfection 

system where it may be exposed to the weather.

•  Install the disinfection system on cold water line only.

• Install the disinfection system before any branch lines.

• 5 Micron filtration must precede the disinfection system. Ideally, the disinfection  

  system should be the last treatment the water receives before consumption.

4

Summary of Contents for SHF-140

Page 1: ...FM 140 SHFM 140 2 SHF 180 SHF 180 2 SHFM 180 SHFM 180 2 425 Clair Rd W Guelph Ontario Canada N1L 1R1 t 1 519 763 1032 tf 1 800 265 7246 US and Canada only t 31 73 747 0144 Europe only f 1 519 763 5069...

Page 2: ...fe coated for stability longer life and increased efficiency Even lamps that look the same will not perform the same Get water confidence with genuine lamps proven to disinfect over their entire lifet...

Page 3: ...ou have taken the first step in ensuring the safety of your water supply by using a totally non intrusive physical disinfection method Your Sterilight system uses the most advanced UV technology on th...

Page 4: ...ce on UV Chamber unless UV chamber has been isolated and depressurized Never service UV Lamps Sleeves or associated hardware until depressurization of UV chamber has been confirmed Hot chamber Allow U...

Page 5: ...gile Eye Protection WEEE waste electrical or electronic equipment This symbol indicates that you should not discard wasted electrical or electronic equipment WEEE in the trash For proper disposal cont...

Page 6: ...d separately 260192 R NORTH AMERICAN NEMA 5 15P 3 PRONG GROUNDED 260198 R CONTINENTAL EUROPEAN CEE 7 7 2 PIN WITH GROUND SCHUKO 260193 R NO CONNECTOR 3 WIRE BARE LEADS 214 fused quartz sleeves with fi...

Page 7: ...is system should only be connected to a properly grounded grounding type power supply receptacle that is protected by a Ground Fault Circuit Interrupter GFCI Inspect operation of GFCI as per manufactu...

Page 8: ...accept the plug from this system Use only extension cords that are intended for outdoor use Use only extension cords having an electrical rating not less than the rating of the system A cord rated for...

Page 9: ...e must be connected to a grounded receptacle and the lamp connector ground wire connected to the stainless steel reactor chamber The disinfection system is designed to be mounted horizontally within t...

Page 10: ...returned to service Please refer to the complete disinfection procedure as outlined on page 7 of this document If the water is to be consumed while the system is off line the water must be boiled for...

Page 11: ...provided Figure 1E 5 Install the UV lamps and UV sensor as outlined on pages 8 10 6 When all plumbing connections are made slowly turn on the water supply and check for leaks The most likely cause fo...

Page 12: ...it is strongly recommended that the entire distribution system located after the UV be chemically disinfected to ensure that the pipework is free from any bacteriological contaminants The disinfectio...

Page 13: ...om the connector simply slide the two apart Avoid touching the lamp on the glass portion Handling the lamp at the ceramic ends is acceptable however if you must touch the lamp glass please use gloves...

Page 14: ...e retaining nuts by turning counter clockwise Figure 3a Drain chamber through drain port Grasp the quartz sleeve and fully remove from the reactor chamber Remove both o rings As with the lamp make sur...

Page 15: ...sensor Disconnect the UV sensor from the Hi Flo Monitored BA ICE M HF controller by disconnecting the sensor cable turning the collar counter clockwise Figure 4B To remove the sensor grasp the body of...

Page 16: ...ired lamp from the reactor chamber dispose of in accordance with local or regional laws and regulations 3 install new UV lamp and connect it to lamp connector refer to page 8 4 replace lamp connector...

Page 17: ...quired to Indicates the UV level is nearing the point of unsafe UV intensity UV system should be immediately serviced Indicates the UV level has now reached a level that is unsafe At this level the wa...

Page 18: ...sh button SWITCH two times in succession and follow steps as outline on page 11 regarding the operation of this feature 4 Lamp failure blank screen Please refer to page 10 for explanation of this feat...

Page 19: ...This Y cable comes with 20 meters 65 of cable for the 4 20 mA signal To install first remove the existing sensor cable from the HF Enclosure Figure 5B and affix the new Y cable Figure 5C Next attach...

Page 20: ...quent use of water run water until it returns to ambient temperature install temperature management valve Water Appears Milky Caused by air in the water lines run water until air is purged Unit Leakin...

Page 21: ...quartz sleeves and sensor eye LED flashing A2 and then back to UV level low UV alarm deferral has been activated UV level has dropped below 50 and the audible alarm has been muted by pressing the res...

Page 22: ...68 lbs 31 8 kg 70 lbs 35 5 kg 78 lbs 36 4 kg 80 lbs Electrical Voltage 100 240V 50 60Hz 100 240V 50 60Hz 100 240V 50 60Hz 100 240V 50 60Hz Power Consumption 350 W 350 W 440 W 440 W Lamp Watts 300 W 30...

Page 23: ...t the problem and identify a solution Please have available the model number system type the date of purchase the name of the dealer from whom you purchased your Sterilight product the source dealer a...

Page 24: ...under these warranties will be covered under warranty up to the end of the warranty period applicable to the original part The above warranties do not include the cost of shipping and handling of retu...

Reviews: