14 / 35
Version 1.9
Copyright ©
eco-CONTROL EC200-B
Operation and maintenance instructions
5.5
Starting up
• Ensure that the mains switch has been turned off.
• Make the earth connection to the potential equalization line.
• Funktionsbereitschaft des / der Dispenser(s) gemäß der mitgelieferten
Inbetriebnahme- und Wartungsanleitung herstellen.
• Connect the plug of the dispenser(s).
• Connect the power supply to the control system.
• Switch on the power supply, and the Dosing system is ready for operation.
Note:
The Dosing system is only ready for operation if the dispenser has been connected.
5.6
Switching on and off
The Dosing system has no mains switch of its own. It is switched on by applying mains
power.
5.7
Shutting down
Shutting down is done in the reverse order of starting up.
5.8
The dosing programs and their areas of application
General
In order to achieve
eco-CONTROL EC200-B
the most accurate results, all the main
factors for a reproducible dosing operation can be set.
The dosing system must be recalibrated when the medium is changed.
See, 5.9, Calibrating page 16.
All the parameters of a dosing program can be saved. When using a memory card, there
are 24 program slots available for permanent storage.
If you do not have a data card, the data is stored temporarily in program slot 00. It is kept
until the dosing system is switched off.
Caution:
Only remove and insert the mains plug of a dispenser (plug 17, section 5.2,
Connections on page 11) once the power has been switched off. Otherwise the
electronics of the drive motor could be damaged.
The following values
can be defined,
depending on the
dosing program used:
Dosing program
Fl
ow
q
ua
nt
ity
Fl
ow
ra
te
D
os
in
g
tim
e
Su
ck
ed
b
ac
k
qu
an
tit
y
Su
ck
b
ac
k
sp
ee
d
Pa
us
e
be
fo
re
Su
ck
in
g
ba
ck
M
at
er
ia
l d
en
si
ty
Quantity program
x
x
x
x
x
x
Start / stop program
x
x
x
x
Time program
x
x
x
x
x