20 / 36
4.1.7
Calibration
To obtain a precise dosing result, the dosing quantity must be calibrated. This is performed
using the eco-CONTROL EC200 DUOMIX dosing control unit. The exact procedure can be
found in the dosing control unit manual.
4.2
Switching on, starting dosing process
Daily at the start of the shift / when starting work, perform the activities as described in
Section 5.1 “Maintenance intervals” (page 24).
Start supply of material to the dispenser.
If present, remove cover.
Switch on the dosing control unit.
Dose the individual components (in manual operation) from the mixing head without mixing
capsule. Use the calibration adapter (36) for this.
Check whether both components escape without bubbles and that the outlet opening are not
blocked or stuck together.
Check the dosing quantity of each of the two components in order to guarantee a consistent
dosing result. If there are deviations, dosing must be calibrated. The exact procedure can be
found in the dosing control unit manual. The result of the check must be recorded together
with the name of the tester, date and time.
A calibration adapter (36) is available for calibrating
the dispenser. It is mounted on the outlet openings.
Mount the calibration adapter (36).
Carry out calibration according to the calibration
programme.
Dismantle the calibration adapter (36).
Attach mixing capsule (25).
Secure clamping sleeve (26).
NOTE
The supply of material to the dispenser must be ensured before dosing starts.
Dry running may destroy the stator.
Fig. 12
S1234
5
36