18
Install the Chassis
and Cab Cabling
Install the cabling to connect the junction boxes and air
transducer interface boxes to the meter in the cab.
When more than one junction box is used mark both
ends of each signal cable so that each cable and
therefore junction box can be identified at the meter.
Use a Y Splitter Cable to connect each signal cable
to the meter.
Securing Excess Cable
For cables that are longer than they need to be you will
need to loop them and retain them using cable ties.
Note:
If you are installing a system on a semi-truck you will
need to refer to the sections for installing the truck to
trailer cable.
Fig 1.48
Step 1.
If possible have the cable in a clear section of chassis.
Fig 1.49
Step 2.
Loop the excess cable back on itself to form a bundle and
cable tie.
Fig 1.50
Step 3.
Add extra ties, tension and cut off excess.
Fig 1.51
Step 4.
Now attach the cable bundle to a convenient support.
Fig 1.52
Step 5.
Tension the cable ties and cut off the excess.
Fig 1.47
SI Onboard TruckWeigh™ Manual
Installation
Summary of Contents for VPG On-Board Weighing SI Onboard TruckWeigh
Page 5: ...5 Installation SI Onboard Installation SI Onboard TruckWeigh Manual Installation ...
Page 23: ...23 Setup Setup SI Onboard TruckWeigh Manual ...
Page 36: ...36 Installation SI Onboard SI Onboard TruckWeigh Manual Setup ...
Page 37: ...37 Calibration Calibration SI Onboard TruckWeigh Manual ...
Page 42: ...42 SI Onboard TruckWeigh Manual Calibration ...
Page 43: ...Appendices Appendices SI Onboard TruckWeigh Manual ...
Page 58: ...58 SI Onboard TruckWeigh Manual Notes ...
Page 59: ......