background image

Panel Assembly – Remaining Walls

Back wall

Locate and arrange the back wall panels from shortest to the highest 

(peak) to create two separate half wall sections. Again, making sure 

the DEEP Channel locks face out, join the panels together as with 

previous assembly instructions. Insert into base track, joining the 

section to the corner post you already attached to the corner of the  

left side wall.

Repeat with the second half back wall, making sure first, to affix a 

corner post to the back wall section. Join the second half back wall 

with the first half wall. 

Right side wall

Repeat assembly instructions, assembling and installing the  

right side wall. 

Right front wall

Finish the right front wall assembly.

7

Lintel and Front Header

Position the lintel into the door 

opening resting it on the door frame 

(Diagram 8A). While standing on a 

ladder, fasten the lintel to the door 

frame on each side of the opening 

with the #8 x 1" pan head screws 

provided (Diagram 8B).
With your assistant, insert the 

preassembled front header section 

into the lintel, joining the assembly 

at the channel locks as with previous 

wall sections and making sure the 

panels are fully seated in the lintel 

(Diagram 8C).
Once the front header is fully seated 

within the lentil, secure the assembly 

from inside the shed by installing the 

#8 x 1" pan head screws (provided) 

into the eleven (11) predrilled holes in 

the  lentil (Diagram 8D).

8

Slope Wall Caps

Position the aluminum slope wall cap on the left wall, lining up its ends 

with the front and back wall. Press down to seat the slope wall cap  

on the wall. Repeat for right side slope wall cap. It may be necessary  

to stand on a ladder for this assembly step.

9

8A

8B

8C

8D

10

Summary of Contents for S-8070-A

Page 1: ...8 x 7 Vinyl Storage Shed PLEASE READ OWNER S MANUAL COMPLETELY BEFORE ASSEMBLING YOUR BUILDING ALL STATED SIZES ARE NOMINAL DIMENSIONS Owner s Manual 8 x 7 2 44m x 2 14m Model S 8070 A Storage Shed...

Page 2: ...re missing please contact the Vision Help Line DO NOT ATTEMPT TO ASSEMBLE THIS PRODUCT IF ANY PARTS ARE MISSING OR DAMAGED Please do not attempt to return this product to the store where you purchased...

Page 3: ...Header RGA 2 RGA 2 RGB 2 RGB 2 Gable End Cap F512G02 F512G02 Door Door NOTE Before assembly of this structure Please take a complete inventory of the parts and components contained in the shed pallet...

Page 4: ...2 8 x 1 Pan Head Screws 150 Hinge Screws 12 8 x 3 4 Pan Head Screws 65 Parts Identification Tools Required Power drill with Phillips 2 or a 2 square bit Carpenter s square Level Rubber mallet Hammer...

Page 5: ...red for your locate climate and soil type Certain building codes may apply as well Request the concrete foundation be made 2 inches larger around all sides than the overall dimensions of the storage s...

Page 6: ...in direct contact with the ground Either support the wood structure on blocks or preferably pour and level a gravel base as a start to your project Using the materials list below you may be able to ha...

Page 7: ...will be match up CHECK 72 1 2 door opening dimension between front Base Tracks NOTE Holes in exterior of Base Tracks are for drainage only DO NOT INSTALL SCREWS IN THESE DRAINAGE HOLES Apply a contin...

Page 8: ...ll section on the flat surface in a similar fashion making sure that the DEEP Channel lock is mated to the SHALLOW Channel lock NOTE If you mistakenly connect two DEEP Channel locks or two SHALLOW Cha...

Page 9: ...post will now have its DEEP Channel lock facing outward to start the left side wall 5 Panel Assembly Left Side Wall Again on a clean flat surface lay out several of the side wall panels there is no di...

Page 10: ...he lintel into the door opening resting it on the door frame Diagram 8A While standing on a ladder fasten the lintel to the door frame on each side of the opening with the 8 x 1 pan head screws provid...

Page 11: ...e the channel locks to avoid striking the that the open end walls of the fascia gable With your assistant position the roof panel assembly Diagram 11B so that the furthest end of the panel assembly re...

Page 12: ...roof You ll know the ridge cap is fully installed when there are no gaps between the ridge cap and the roof panels 12 Roof Fascia Caps Attach the Roof Fascia Caps over the exposed edge of the roof pan...

Page 13: ...Figure 16A use the following instructions to correct To obtain an even vertical gap between the doors i e the doors are touching at the top or the bottom gently push the building back and forth not si...

Page 14: ...easonably snug Do not overtighten 17 Insert and Fasten Screws to the Interior Components Insert 8 x 1 pan head screws at the seams DRAWING in all predrilled holes on the ridge beam in the slope wall c...

Page 15: ...ecommended that fasteners be self tapping screws no longer than 1 inch long and at least 10 in size Screws provided with certain hanging devices may be longer or inappropriate for this application Scr...

Reviews: