background image

Ridge Beam

With an assistant holding one end of the ridge 

beam, position the front of the beam at the  

flat edge of the header peak and the back wall 

peak. It also may be necessary to stand on a 

ladder for this assembly step. Note the notches 

in the bottom section of the ridge beam. 

Carefully slide the notches over the inner and 

outer wall of the header panels making sure  

the opening in the bottom of the ridge beam 

engages over the center seam of the head  

wall. Press down to make sure the ridge  

beam if full seated and that the flat part of the 

beam sits flush with the flat part of the center 

header panels.
Repeat this step on the header portion of the 

back wall.

10

Roof Panels and Fascia Gables

Arrange the roof panels on a clean surface and join three or four 

together by inserting and securing the Channel locks per previous 

instructions. Again, make sure the DEEP Channel locks face out 

(up). Join a fascia gable to one side of the roof panel section, 

engaging and securing the channel locks noting the angle notched 

end. This notched end of the fascia gable (Diagram 11A) will meet 

the slope wall cap at the top of the side wall. Take care when using 

the rubber mallet to engage the channel locks to avoid striking the 

that the open end walls of the fascia gable. 
With your assistant, position the roof panel assembly (Diagram 11B) 

so that the furthest end of the panel assembly rests fully on the 

ridge beam (as tight as possible to the vertical edge of the beam) 

while placing the fascia gable end over the slope of the header 

section. Make sure the fascia gable fully seats on the header.

Assemble and another three or four roof panels into a section  

and join with the previous roof panel section to further complete  

the roof. Your assistant should stand inside the shed, bracing the 

new roof section with his/her hands as you use the rubber mallet 

above to engage the channel locks, securing the section to the 

previous section.
Complete the left half of the roof by assembling the last three or 

four roof panels with a rear fascia gable, installing on the rear 

header as you did with the roof sections toward the front. With the 

rubber mallet, gently strike the lower ends of the roof section to 

make sure the top ends of the roof section rest fully against the 

vertical section of the beam.
Repeat steps for the right half of the roof. Again, strike lower ends 

of the roof panels on both sides of the roof making sure they rest 

against the vertical edge of the ridge beam.

11

Carefully slide the notch over the inner 

and outer wall of the header panel.

11B

11A

11

Summary of Contents for S-8070-A

Page 1: ...8 x 7 Vinyl Storage Shed PLEASE READ OWNER S MANUAL COMPLETELY BEFORE ASSEMBLING YOUR BUILDING ALL STATED SIZES ARE NOMINAL DIMENSIONS Owner s Manual 8 x 7 2 44m x 2 14m Model S 8070 A Storage Shed...

Page 2: ...re missing please contact the Vision Help Line DO NOT ATTEMPT TO ASSEMBLE THIS PRODUCT IF ANY PARTS ARE MISSING OR DAMAGED Please do not attempt to return this product to the store where you purchased...

Page 3: ...Header RGA 2 RGA 2 RGB 2 RGB 2 Gable End Cap F512G02 F512G02 Door Door NOTE Before assembly of this structure Please take a complete inventory of the parts and components contained in the shed pallet...

Page 4: ...2 8 x 1 Pan Head Screws 150 Hinge Screws 12 8 x 3 4 Pan Head Screws 65 Parts Identification Tools Required Power drill with Phillips 2 or a 2 square bit Carpenter s square Level Rubber mallet Hammer...

Page 5: ...red for your locate climate and soil type Certain building codes may apply as well Request the concrete foundation be made 2 inches larger around all sides than the overall dimensions of the storage s...

Page 6: ...in direct contact with the ground Either support the wood structure on blocks or preferably pour and level a gravel base as a start to your project Using the materials list below you may be able to ha...

Page 7: ...will be match up CHECK 72 1 2 door opening dimension between front Base Tracks NOTE Holes in exterior of Base Tracks are for drainage only DO NOT INSTALL SCREWS IN THESE DRAINAGE HOLES Apply a contin...

Page 8: ...ll section on the flat surface in a similar fashion making sure that the DEEP Channel lock is mated to the SHALLOW Channel lock NOTE If you mistakenly connect two DEEP Channel locks or two SHALLOW Cha...

Page 9: ...post will now have its DEEP Channel lock facing outward to start the left side wall 5 Panel Assembly Left Side Wall Again on a clean flat surface lay out several of the side wall panels there is no di...

Page 10: ...he lintel into the door opening resting it on the door frame Diagram 8A While standing on a ladder fasten the lintel to the door frame on each side of the opening with the 8 x 1 pan head screws provid...

Page 11: ...e the channel locks to avoid striking the that the open end walls of the fascia gable With your assistant position the roof panel assembly Diagram 11B so that the furthest end of the panel assembly re...

Page 12: ...roof You ll know the ridge cap is fully installed when there are no gaps between the ridge cap and the roof panels 12 Roof Fascia Caps Attach the Roof Fascia Caps over the exposed edge of the roof pan...

Page 13: ...Figure 16A use the following instructions to correct To obtain an even vertical gap between the doors i e the doors are touching at the top or the bottom gently push the building back and forth not si...

Page 14: ...easonably snug Do not overtighten 17 Insert and Fasten Screws to the Interior Components Insert 8 x 1 pan head screws at the seams DRAWING in all predrilled holes on the ridge beam in the slope wall c...

Page 15: ...ecommended that fasteners be self tapping screws no longer than 1 inch long and at least 10 in size Screws provided with certain hanging devices may be longer or inappropriate for this application Scr...

Reviews: