Doors

Locate the left and right hand doors. 

The right hand door features a full length 

astragal door strike along one edge 

(Diagram 15A) which closes over the left 

hand door. Doors must be installed so 

that they open out from the shed.  Install 

the right hand door first by aligning the 

top and bottom hinges with the predrilled 

holes in the aluminum frame of the door 

opening. Use the screws (Diagram 15B) 

provided. Install the left hand door in the 

same manner, checking to make sure the 

right hand door seats flush and square 

against the left hand door astragal.

Affix a door handle on the outside of each 

door with the bolts provided (Diagram 

15C). Affix slide locks top and bottom on 

the door (not shown).

15

Door Alignment Tips

Before attempting to align doors, while inside 

the building, insert a screw in the first hole of the 

Base Tracks at the Door Jambs. 

NOTE:
1. Before you install screws in the Slope Wall Caps 

(roof/wall line), you must 

align

 the doors. 

DO NOT

 

install screws unless the doors are lined up properly.
2. If you have installed your doors and you are 

experiencing problems, as in Figure 16A, use the 

following instructions to correct: To obtain an even 

vertical gap between the doors, i.e. the doors are 

touching at the top or the bottom, gently push the 

building back and forth, not side to side. To obtain 

an even horizontal gap between the doors and the 

Door Lintel, i.e. the top of one door is higher than 

the other, gently push the shed side to side. You will 

notice that the doors shift as you push the building.
3. If you have installed your doors and you are 

experiencing problems as in Figure 16B, use the 

following instructions to correct: In Figure 16B,  

the right door does not line up properly with the left 

door because the bottom of the right door appears 

bent inward. To correct this, gently push on the 

building at the top of the front right corner (at the 

point shown in Figure 16B) until the right door is 

aligned properly. If the left door appears bent  

inward, correct the alignment by pushing on the  

top left corner of the building.
4. Complete your assembly by installing a few 

screws at a time. For example, install two or three 

screws and check your doors. Repeat this procedure 

until all the screws are installed.
5. If you are still experiencing problems, call the 

consumer service line for assistance.

16

15A

15B

15C

16A

16B

Right door shown from 

inside shed.

13

Summary of Contents for S-8070-A

Page 1: ...8 x 7 Vinyl Storage Shed PLEASE READ OWNER S MANUAL COMPLETELY BEFORE ASSEMBLING YOUR BUILDING ALL STATED SIZES ARE NOMINAL DIMENSIONS Owner s Manual 8 x 7 2 44m x 2 14m Model S 8070 A Storage Shed...

Page 2: ...re missing please contact the Vision Help Line DO NOT ATTEMPT TO ASSEMBLE THIS PRODUCT IF ANY PARTS ARE MISSING OR DAMAGED Please do not attempt to return this product to the store where you purchased...

Page 3: ...Header RGA 2 RGA 2 RGB 2 RGB 2 Gable End Cap F512G02 F512G02 Door Door NOTE Before assembly of this structure Please take a complete inventory of the parts and components contained in the shed pallet...

Page 4: ...2 8 x 1 Pan Head Screws 150 Hinge Screws 12 8 x 3 4 Pan Head Screws 65 Parts Identification Tools Required Power drill with Phillips 2 or a 2 square bit Carpenter s square Level Rubber mallet Hammer...

Page 5: ...red for your locate climate and soil type Certain building codes may apply as well Request the concrete foundation be made 2 inches larger around all sides than the overall dimensions of the storage s...

Page 6: ...in direct contact with the ground Either support the wood structure on blocks or preferably pour and level a gravel base as a start to your project Using the materials list below you may be able to ha...

Page 7: ...will be match up CHECK 72 1 2 door opening dimension between front Base Tracks NOTE Holes in exterior of Base Tracks are for drainage only DO NOT INSTALL SCREWS IN THESE DRAINAGE HOLES Apply a contin...

Page 8: ...ll section on the flat surface in a similar fashion making sure that the DEEP Channel lock is mated to the SHALLOW Channel lock NOTE If you mistakenly connect two DEEP Channel locks or two SHALLOW Cha...

Page 9: ...post will now have its DEEP Channel lock facing outward to start the left side wall 5 Panel Assembly Left Side Wall Again on a clean flat surface lay out several of the side wall panels there is no di...

Page 10: ...he lintel into the door opening resting it on the door frame Diagram 8A While standing on a ladder fasten the lintel to the door frame on each side of the opening with the 8 x 1 pan head screws provid...

Page 11: ...e the channel locks to avoid striking the that the open end walls of the fascia gable With your assistant position the roof panel assembly Diagram 11B so that the furthest end of the panel assembly re...

Page 12: ...roof You ll know the ridge cap is fully installed when there are no gaps between the ridge cap and the roof panels 12 Roof Fascia Caps Attach the Roof Fascia Caps over the exposed edge of the roof pan...

Page 13: ...Figure 16A use the following instructions to correct To obtain an even vertical gap between the doors i e the doors are touching at the top or the bottom gently push the building back and forth not si...

Page 14: ...easonably snug Do not overtighten 17 Insert and Fasten Screws to the Interior Components Insert 8 x 1 pan head screws at the seams DRAWING in all predrilled holes on the ridge beam in the slope wall c...

Page 15: ...ecommended that fasteners be self tapping screws no longer than 1 inch long and at least 10 in size Screws provided with certain hanging devices may be longer or inappropriate for this application Scr...

Reviews: