2 Installation
2.1 Unpack checking
1)
Don’t lean the UPS when moving it out from the packaging.
2) Check the appearance to see if the UPS is damaged during transportation, do
not switch on the UPS if any damaged is found and please contact the dealer.
3) Check the accessories according to the packing list and contact the dealer if
found any parts missing
2.2 Installation procedure
2.2.1 Installation note
* Put the UPS at flat place next to the equipment.
* Keep the UPS at least 20cm from wall or equipment or other object.
Don’t block
the ventilation holes of the UPS located in the front panel and the bottom part, so as
to *keep the ventilation in good conditions, avoid temperature of components inside
getting high.
* Keep the UPS away from high temperature, water, flammable gas, corrosive gas,
dust, direct sunlight and explosive things .
* Don't lay the UPS outdoor.
* 63A circuit breaker is required at the input L-N for 6KVA UPS, while 100A for the
10KVA UPS.
* PDU is required to connect to the UPS output so as to weaken the affection
between loads.
* In order to fix the UPS, please lock its wheels by shifting the sheet on each wheel.
* RCD load like computer, linear load and small inductive load can be connected
with the UPS. Please contact dealer if other types of loads is required to be
connected with.
* For the sake of user and equipments, please betake correct power configuration.
Fig.2-1 Correct power configuration