DQ Technology, Inc. / VisionNet
Page 22
M605N User Manual Revision 3.1
Section 3.2 – WAN Logic and Theory
WAN INTERFACE / SERVICE CONSTRUCTION AND DECONSTRUCTION – A BRIEF INTRO
In the past, creating a WAN Service was a single operation in which the WAN Interface and WAN Service were created at the same
time. This was because there was only one WAN Interface to choose from. Now that there are multiple WAN Interfaces to choose
from, you must create the WAN Interface and the WAN Service separately.
PREVIOUS METHOD
NEW METHOD
SO WHAT CHANGED?
VisionNet Gateways now support
•
ATM
(Traditional DSL)
•
PTM
(Used for VDSL2 and PTM over ADSL2+)
•
Ethernet
(Used for Ethernet WAN Port Operation)
Which means that there are now two separate processes
BUILDING A WAN SERVICE
Create WAN Interface
→
Create WAN Service associated with WAN Interface
TEARING DOWN (REMOVING) A WAN SERVICE
Delete WAN Service associated with WAN Interface
→
Delete WAN Interface