7
5. DOOR
Push the door gliders (1014) onto both ends of
door bar (1060) (5.1).
Assemble the door as shown in diagram 5.
Connect door rollers (1015) to the door bar
(1062) using bolt (1004), washer (1009) and
nut (1007) (5.4). Bolt door bar (1062) to upper
bar (1059) (5.3) and slide the door seal (1021)
into both side bars (1058) (5.6). Connect the
door fixer (1111) as shown.
The door rollers can now be slid into door
runner bar (1047) (5.7). Please ensure that the
door gliders are also running on the bottom
track (5.5). Once the door is correctly in place,
connect a nut and bolt into the end of door
runner bar (1047) as door stopper.
Adjust the door so that it moves freely.
6. ROOF VENTS
Connect the side bars (1065) and the top bar
(1088) depending on the glass thickness.
Up to 4 mm, see (6.1). For 4 mm and over,
see (6.2).
Place the bolts to connect the bottom bar
(1090) in the prepared holes, and then slide
the glass into the tracks in side bars (1065)
(6.3).
Now connect bottom bar (1066), and ensure
that the window is totally square before
tighten ing all bolts.
Position the window in the ridge bar from one
end (6.4) and (6.5) and slide it to the required
position (6.6).
Connect the window sill (1063) with the extra
bolts in the roof glazing bars (6.7). If the
window is connected in a corner position, then
it is necessary to use bolt (2001), instead of
(1001), on the corner bar.
Bolt the window opener (1067) to the bottom
bar (1090) (6.7) using screws (1006) (6.8).
Place the plastic cap (1019) over the end of
the window opener (6.6) and connect both
window fixers (1016) onto the window sill
(1063) using screws (1006) (6.8).
7. GLAZING – CLEAR/FROSTED GLASS
Please note the already mentioned safety
precautions.
Press the glazing seals (1020) onto the alumi-
nium profiles (7.3) and cut to length.
On the roof, begin by positioning the glass at
the ridge and fix in place using the glazing
spring clips (1011) (7.2). The following pane
should slide under the pane directly above it
with the glass retaining clips (1012) between
the panes (7.1). Continue as shown in the
glazing plan. If difficulties arise in placing the
last pane, please ensure that those above
have not slipped down.
On the sides please begin from the bottom.
FINISHING
If desired, it is possible to seal the greenhouse
at the edges using silicon. Silicon is not in-
cluded.
Place the warning label inside the house.
A full range of greenhouse accessories, to help
you make the most of this product, is available
from your stockist. Please inform yourself as to
the possibilities.
SAFETY NOTICE
In the event of high wind conditions, close the
door and all vents.
COMMENTS
For the complete protection of your new
greenhouse, we advise you to include it in
your house insurance. Please take note of
possible building rules relating to the position-
ing of greenhouses.
Please stick the included greenhouse model
label onto the door bar (1062) after success-
fully assembling this product. This information
is important in the event that replacement
parts are later required.
Please keep these Assembly Instructions in
a safe place, for future reference!
Our policy is one of continuous improvement
and we reserve the right to change the specifi-
cations without prior notice.
004.00.0802