4
SICHERHEITSVORKEHRUNGEN
SIte SelectIoN
Always try to select a sunny location, sheltered
from the wind as much as possible.
ImPoRtaNt
Before assembling your new greenhouse,
please check that all parts in the provided list
are included. Please take each bundle out of
the packaging in order to identify the parts
better.
It is important that the opened bundles do not
get mixed with one another.
If something is missing please contact your
retailer.
Nuts (1002) - max. tightening torque 3Nm.
NeceSSaRy toolS
Screw drivers (Normal and Crosshead PH2),
10 mm socket spanner or wrench, 10 mm
combination spanner, knife, measuring stick,
spirit level, Accu-drill with adjustable torque.
maINteNaNce
The greenhouse should be thoroughly washed
with a gentle detergent occasionally. Please
check that the detergent used does not react
aggressively with aluminium or the glass fixing
clips.
Ensure that the upper and lower door tracks
are cleaned regularly to avoid a build up of
debris.
0. BaSe
Important!
The base must be exactly square
and level. A zinc-coated steel base is available
as an accessory for all greenhouse models.
(
attention!
Only when the greenhouse has to
be located in a very windy and unprotected
location:
Drill through both the profile at the
base of the greenhouse and the steel base,
and connect them with nuts and bolts.)
If you would rather construct your own stone
or concrete foundation, please follow the
dimensions specified in diagram 0. Treated
wooden beams at least 18 mm high and not
more then 32 mm wide should be positioned
between the stone/concrete foundation and
the aluminium frame, and connected to the
foundation with 50 mm long bolts (not pro-
vided).
Foundations must extend down below the frost
level.
Diagrams in a single frame show the view
from inside the greenhouse. those enclo-
sed in a double frame show the view from
outside the greenhouse.
1. SIDe elemeNtS
Lay all of the parts on the floor and connect
them loosely.
For model 7300 only:
The corner braces
(2056) must also be connected to each bar
(1032) at this point (1.3).
2. PlaIN GaBle eND
Lay all of the parts on the floor and connect
them loosely.
Please include an extra connect ing bolt in
each vertical bar (1041) and (1042) to connect
brace (1035) (2.2).
3. DooR GaBle eND
Lay all of the parts on the floor and connect
them loosely.
The door runner bar (1347) will be connected
to the horizontal bar (1048). Connect these
loosely from the outside with two nuts and
bolts.
Connect the clips (1013) as shown in (3.6)
with a bolt, in order to strengthen the structure.
Please ensure that the clip edge overlaps, and
fixes the vertical bars (1044) or (1045) as
shown.
Depending on which direction the door should
open, align the door runner bar (1347) to the
left or to the right.
4. coNNectING the SePaRate
elemeNtS
Bolt the side elements to the end elements.
(4.1) & (4.2).
Connect the side braces (1280) between the
eave and sill bars (4.1) & (4.3).
Assemble the ridge bar to both gable ends.
(4.4).
Now connect the roof glazing bars (1055)
between the eaves (4.5) and the ridge bar
(4.6). An extra bolt should be inserted into
each glazing bar (1055) at this time to connect
roof braces (1056). Additionally, insert in 4 of
the roof glazing bars (1055) an extra bolt,
where the roof vent(s) will be positioned later.
The roof braces (1056) can now be connected
(4.6).
For model 7300 only:
Please add an extra
bolt to all roof bars (1055), at the eave end for
the already connected corner braces (2056)
(4.5).
Now position your greenhouse on the pre-
pared base/foundation and connect loosely.
Adjust the greenhouse until it is completely
square and tighten all bolts.
Please do not over tighten. (max. 3Nm)
Connect the door runner support (1057) to the
door runner bar (1347) (4.7) and to the gable
end using bolt (1005) and spacer (1310) (4.8).
Press the end protectors (1017) and (1018)
onto the profile ends (4.9).
5. DooR
attention:
Do not stand the assembled door
on the door gliders (1014) to avoid damaging
assembly Instructions
safety Warning
EN
1. PLEASE READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE ASSEMBLING YOUR GREENHOUSE.
2. Sharp edges and corners can cause injury. Always wear protective glasses, gloves, shoes and headgear when handling the aluminium profiles, glass and
polycarbonate sheets. Broken glass is a safety hazard – always clear up immediately and dispose of with care.
3.
The product you have purchased is intended only for the growing of plants
and should only be used for this purpose. When used for other purposes we will
take no responsibility.
4. It is recommended that this greenhouse is assembled by two people.
5. Should you encounter difficulties constructing this house, or in fitting the glass or polycarbonate sheets, please contact your retailer
– do not use force!
6. The greenhouse must always be anchored.
004.01.1601