background image

4

SICHERHEITSVORKEHRUNGEN

1. PLEASE READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE ASSEMBLING YOUR GREENHOUSE. 
2.   Sharp edges and corners can cause injury. Always wear protective glasses, gloves, shoes and headgear when handling the aluminium profi les, glass and 

polycarbonate sheets. Broken glass is a safety hazard – always clear up immediately and dispose of with care.

3.  The product you have purchased is intended only for the growing of plants and should only be used for this purpose. When used for other purposes we 

will take no responsibility.

4. It is recommended that this greenhouse is assembled by two people.
5.  Should you encounter diffi culties constructing this house, or in fi tting the glass or polycarbonate sheets, please contact your retailer 

– 

do not use force!

Assembly Instructions

Safety Warning

 

SITE SELECTION

 

 

Always try to select a sunny location, sheltered 
from the wind as much as possible.
 

 IMPORTANT

 

 

Before assembling your new greenhouse, 
please check that all parts in the provided list 
are included. Please take each bundle out of 
the packaging in order to identify the parts 
better.
It is important that the opened bundles do not 
get mixed with one another.
If something is missing please contact your 
retailer.

 

NECESSARY TOOLS

 

 

Screw drivers (Normal and Crosshead PH2), 
10 mm socket spanner or wrench, 10 mm 
combination spanner, knife, measuring stick, 
spirit level, Accu-drill with adjustable torque.

 

MAINTENANCE

 

 

The greenhouse should be thoroughly washed 
with a gentle detergent occasionally. Please 
check that the detergent used does not react 
aggressively with aluminium or the glass fi xing 
clips. 
Ensure that the upper and lower door tracks 
are cleaned regularly to avoid a build up of 
debris. 

 0. BASE

 

 

Important! 

The base must be exactly square 

and level. A zinc-coated steel base is available 
as an accessory for all greenhouse models.  
(

Attention!

 Only when the greenhouse has to 

be located in a very windy and unprotected 
location: Drill through both the profi le at the 
base of the greenhouse and the steel base, 

and connect them with nuts and bolts.)

If you would rather construct your own stone 
or concrete foundation, please follow the 
dimensions specifi ed in diagram 0. Treated 
wooden beams at least 18 mm high and not 
more then 32 mm wide should be positioned 
between the stone/concrete foundation and 
the aluminium frame, and connected to the 
foundation with 50 mm long bolts (not pro-
vided). 

Foundations must extend down below the frost 
level.

Diagrams in a single frame show the 

view from inside the greenhouse. Those 

enclosed in a double frame show the 

view from outside the greenhouse.

 1. FRONT

 

 

Lay all of the parts on the fl oor and connect 
them loosely. 
Loosely connect the corner plates (1092) on 
the upper corners. 

 2. ASSEMBLY

 

 

Connect the gable end bars (4086 / 4087) 
between the eaves door track (4090) (2.1) and 
the vertical wall bars (4088 / 4089) (2.3). Now 
connect the ridge bar (4052) (2.3) and then sill 
bars (1022) (2.4 & 2.5).
Loosely connect the corner plates (1092) 
above the eaves (2.1) and at the roof ridge 
(2.3). 
Connect the side glazing bars (4091 / 4092), 
including two extra bolts in each glazing bar. 
Connect side braces (4094).
Connect the roof glazing bars (4056) between 

the eaves (2.2) and the ridge bar (2.3). 
Please use the washers (7395) at all connec-
tion points to eaves door track (4090) (2.1 & 
2.2).
It is necessary to include one extra bolt in the 
glazing bars (4056) at this point, to later 
connect the roof vent.

 3. ASSEMBLY ON WALL

 

 

Now position your greenhouse on the pre-
pared base/foundation and connect loosely. 
Adjust the greenhouse until it is completely 
square and tighten all bolts. 

Please do not over tighten.

Ensure that the sides are perfectly vertical. 
Note the pre-drilled holes in the vertical wall 
bars (4088 / 4089)) and ridge bar (4052) and 
mark them on the wall. 
Remove the frame from the base.
Drill 6 mm holes in the wall as marked and 
place the provided wall plugs (2003) in the 
wall. (The drill is not included).
Replace the frame on the base and connect it 
to the wall using screws (2002) (3.1) & (3.2).
Finally connect the frame to the base if desired.  

 4L and 4R. DOORS

 

 

Attention: Do not stand the assem-
bled doors on the door gliders 
(1014) to avoid damaging them.

Push the door gliders (1014) onto both ends of 
door bar (1060) (4.1).
Assemble the doors as shown in diagram 4.
Connect door rollers (1015) to the door bar 
(1062) using bolt (1004), washer (1009) and 
nut (1007) (4.4). 

007.02.1012

Summary of Contents for IDA 3300

Page 1: ...Westfalia Bedienungsanleitung Nr 109976...

Page 2: ...007 02 1012 IDA 3300 Assembly instructions Montageanleitung Notice de Montage Montage Instructies Montagevejledning Monteringsanvisning Montasjeveiledning D F NL DK S N...

Page 3: ...6 1007 4R L M4 4 1009 4R L 8 4 4 1011 6 70 170 1012 6 11 50 1014 4R L 20 4 1015 4R L 22 4 1019 5 15 1 1020 6 49000 1 Item No Part Sect Ref Size mm Quantity per 3300 1022 2 1240 2 1059 4R L 621 2 1060...

Page 4: ...0 2 2046 1 2484 1 2097 1 619 2 3021 4R L 1800 2 4035 1 1650 2 4042 2 1650 2 4049 1 1704 2 4052 2 2484 1 Item No Part Sect Ref Size mm Quantity per 3300 4056 2 1330 5 3 4059 4R L 1628 2 4086 2 1354 1 4...

Page 5: ...ther construct your own stone or concrete foundation please follow the dimensions specified in diagram 0 Treated wooden beams at least 18 mm high and not more then 32 mm wide should be positioned betw...

Page 6: ...profiles 6 3 and cut to length On the roof begin by positioning the glass at the ridge and fix in place using the glazing spring clips 1011 6 2 The following pane should slide under the pane directly...

Page 7: ...1092 lose mit den oberen Ecken 2 MONTAGE Verschrauben Sie die Giebelendprofile 4086 4087 mit der oberen T rf hrungsschiene 4090 2 1 und den vertikalen Wandprofilen 4088 4089 2 3 Nun verschrauben Sie...

Page 8: ...entsprechend 5 7 mit den vorhandenen Leerschrauben festschrauben Den Dachfensteraufsteller 1067 mit dem unteren Fensterprofil 1066 verschrauben Hierbei werden die Schrauben 1006 verwendet 5 8 Die vor...

Page 9: ...18 IDA 3300 0 0 007 02 1012 IDA 3300 A 1279 mm B 2544 mm 30 x 20 mm A B X X 30 mm 30 mm...

Page 10: ...097 1092 1092 4049 4035 4035 4049 1001 18x 1002 18x 1092 2x 2046 1x 2097 2x 4035 2x 4042 2x 4049 2x 4090 1x 4090 2046 4042 1 1 1 3 1 4 1 2 1 6 1 8 4042 4035 2046 4090 4042 4042 4035 2097 2097 2046 404...

Page 11: ...4089 1022 1022 4091 4094 4094 4087 1001 46x 1002 46x 1022 2x 1092 6x 4052 1x 4056 3x 4086 1x 4087 1x 4088 1x 4089 1x 4091 1x 4092 1x 4094 4x 7395 7x 2 5 2 3 2 4 4086 4088 1022 2 2 2 1 2 6 2 7 4094 408...

Page 12: ...IDA 3300 3 IDA 3300 21 007 02 1012 3 1 3 2 3 1 3 2 2002 2002 2003 2003 4052 4088 4089 2002 15x 2003 15x...

Page 13: ...2x 1007 2x 1009 2x 1014 2x 1015 2x 1059 1x 1060 1x 1061 2x 1062 1x 1111 1x 1112 1x 1113 1x 2005 1x 2006 1x 3021 1x 4059 1x 4099 1x 4 8 3021 4 1 4 5 4 2 4 2 4099 1061 1059 1062 1060 4059 4 6 4 3 4 7 4...

Page 14: ...004 2x 1007 2x 1009 2x 1014 2x 1015 2x 1059 1x 1060 1x 1061 2x 1062 1x 1111 1x 1112 1x 1113 1x 3021 1x 4059 1x 4098 1x 4 8 3021 4 1 4 5 4 2 4 2 4059 1061 1059 1062 1060 4098 4 6 4 4 4 8 4 3 4 7 4 5 4...

Page 15: ...007 02 1012 5 3 5 4 5 5 1065 1001 1066 1064 5 1 5 2 1001 4x 1002 4x 1006 6x 1019 1x 1063 1x 1064 1x 1065 2x 1066 1x 1067 1x 2016 2x 5 6 5 7 5 8 1063 2016 1006 1019 1067 Art No mm 3300 4 369430 600 x 5...

Page 16: ...007 02 1012 6 1 6 2 6 3 No mm 3300 1 3679041 610 x 559 18 2 3679461 610 x 408 8 3 3679471 610 x 549 3 4 3679491 600 x 544 1 5 3679011 610 x 610 4 6 3679481 610 x 248 2 7 3679571 610 x 512 x 264 2 8 3...

Page 17: ...strasse 30 44149 Dortmund Deutschland Tel 49 231 941655 0 Fax 49 231 941655 99 www eph schmidt de verkauf eph schmidt de OPJ A S Volderslevvej 36 A Postboks 480 5260 Odense S Danmark Tel 45 66 15 10 3...

Reviews: