8
ENGLISH
wait until it cools, then open the filler cap (2),
turn the iron and pour off excess water (Fig. 6).
Cleaning of the steam chamber
To extend the life of the iron it is recommended
to perform regular cleaning of the steam cham-
ber, especially in areas with hard tap water.
−
Set the constant supply of steam (4) to «
»
(steam off).
−
Fill the container (10) water to the «MAX»
mark (12).
−
Put the iron on the base (8).
−
Plug the power cord into an outlet.
−
Turn the regulator(9) set the maximum heat-
ing temperature of the soleplate «MAX», the
indicator lights (6).
−
When the soleplate (13) warms up to temper-
ature, the indicator (6) disappears. Wait for
reheating of the soleplate, after that you can
clean the steam chamber.
−
Remove the plug from the socket.
−
Place the iron horizontally above the sink, press
and hold the «SELF-CLEAN» button (11).
−
Boiling water and steam along with the scum
will be coming out of the holes of soleplate (13).
−
Slightly shake the iron forward and back until
all the water will come from a reservoir (10).
−
Put the iron on the base (8) and let it become
completely cool.
−
When the soleplate (13) is completely cool,
wipe it with a piece of dry cloth.
−
Before removing iron, make sure that there
is no water in the tank (10)and the soleplate
(13) is dry.
Care and Cleaning
−
Before cleaning the iron, make sure it is un-
plugged and has cooled down.
−
Clean the iron trunk with a slightly damp
cloth, then it should be wiped with a dry one.
−
The deposits on the soleplate can be re-
moved with a cloth dampened in water and
vinegar solution.
−
After removing of sediment, polish the sur-
face with a dry cloth.
−
Do not clean the soleplate and body of the
iron with abrasives.
−
Avoid contact of the iron soleplate with sharp
metal objects.
−
Depending on water hardness in your area,
change the water softener cartridge periodi-
cally (14). To remove the cartridge, open the
filler (2), turn the cartridge (14) counterclock-
wise and pull it upward (Fig. 7).
−
Install a new cartridge, then turn it clockwise
to lock and close the filler (Fig. 8.
Storage
−
Set the temperature (9) to «MIN» position,
and the constant control of steam (4) to «
»
(steam off).
−
Remove the plug from the socket.
−
Open the lid of filler (2), turn the iron and
drain the remaining water from the water tank
(10) (Fig. 6).
−
Close the lid of(2).
−
Set iron on its heel and let it become com-
pletely cool.
−
Roll up the power cord of the iron.
−
Keep the iron upright in a cool, dry place in-
accessible to children.
Delivery set
Iron - 1 item
Cartridge - 1 item
Measuring cup - 1 item
Manual - 1 item
T
echnical characteristics
Power supply: 220-240
~
V 50/60 Hz
Power: 2270–2700 W
Water tank: 380 ml
Life span of the iron - 3 years
The manufacturer preserves the right to change
the design and specifications of the unit without
a preliminary notification.
Guarantee
Details regarding guarantee conditions can be
obtained from the dealer from whom the appli-
ance was purchased. The bill of sale or receipt
must be produced when making any claim under
the terms of this guarantee.
This product conforms to the EMC-
Requirements as laid down by the Council
Directive 2004/108/ЕС and to the Low
Voltage Regulation (2006/95/ЕС)
VT-1211_IM.indd 8
10.11.2014 15:13:28
Summary of Contents for VT-1211 PR
Page 1: ...1 Steam iron VT 1211 PR VT 1211_IM indd 1 10 11 2014 15 13 24...
Page 2: ...VT 1211_IM indd 2 10 11 2014 15 13 25...
Page 3: ...VT 1211_IM indd 3 10 11 2014 15 13 27...
Page 9: ...9 8 8 8 VT 1211_IM indd 9 10 11 2014 15 13 29...
Page 12: ...12 MAX 8 9 MAX 6 13 6 5 2 10 8 9 MAX 6 4 6 9 MIN VT 1211_IM indd 12 10 11 2014 15 13 29...
Page 15: ...15 8 8 8 VT 1211_IM indd 15 10 11 2014 15 13 29...
Page 21: ...21 8 i 8 8 VT 1211_IM indd 21 10 11 2014 15 13 30...
Page 27: ...27 i 8 i 8 8 i i i VT 1211_IM indd 27 10 11 2014 15 13 31...
Page 30: ...30 i MAX 8 9 MAX 6 13 6 5 2 10 8 9 MAX 6 4 6 9 MIN 13 VT 1211_IM indd 30 10 11 2014 15 13 31...
Page 40: ...2014 GOLDER ELECTRONICS LLC 2014 VT 1211_IM indd 40 10 11 2014 15 13 33...