5
ENGLISH
•
Switch the coffee maker off by pressing the
button (13) «
».
•
Remove the tray grid (6), remove the tray and
pour the water out of it, install the tray and the
grid (6) back to their places.
•
The coffee maker is ready for operation.
MAKING ESPRESSO
•
Remove the water tank (2), fill it with cold
water up to the «MAX» mark and install it back
to its place. Make sure that the water level in
the tank (2) is not below the mark «MIN», reg-
ularly add water to the tank (2).
•
Put ground coffee in one filter (9) using the
measuring spoon (13), slightly tamp the
coffee with the back side of the measuring
spoon (13).
•
Install the filter holder (10) back to its instal-
lation place. The filter holder (10) ledges
should match the groves on the boiler «
»,
after that turn the filter holder handle (12) to
the utmost right position «
».
•
Place the cup on the tray grid (6).
•
Insert the power plug into the mains socket.
•
Switch the coffee maker on by pressing the
button (17) «
», you will hear a sound signal
and the button (17) illumination will light up.
Notes:
–
it is recommended to fill the boiler with water
before making coffee.
–
place a suitable cup under the tip (5).
–
turn the steam supply control knob (3) to the
position «
», steam will start going out from
the tip (5), be careful, after 10-15 seconds set
the control knob (3) to the position «
».
•
Wait until water in the boiler heats up, the
buttons (15, 16) «
,
» will be glowing
constantly.
Notes: - the cups used need to be preheated;
to do this, place the cups on the upper tray, while
water is heated in the boiler, the tray heats up,
thus warming the cups.
•
To make one cup of espresso use a small fil-
ter (9) and press the button (16) «
», the
pump will switch on for 3 seconds for pre-
liminary soaking of coffee; after a pause the
pump will be switched on and operate for
60 seconds (the operation time is set by
default).
•
To make two cups of espresso use a big
filter (9) and press the button (15) «
»,
in this case set one big or two small cups
on the grid (6). When you press the but-
ton (15) «
», the pump will switch on for
3 seconds for preliminary soaking of coffee;
after a pause the pump will be switched on
and operate for 60 seconds (the operation
time is set by default).
Setting the amount of ready coffee
•
If necessary, you can set up the pump oper-
ation time, in this case the amount of ready
coffee will be different.
•
Wait until water in the boiler heats up, the
buttons (15, 16) «
,
» will be glowing
constantly.
•
Press and hold the button (16) «
», the
pump will switch on for 3 seconds for pre-
liminary soaking of coffee; after a pause the
pump will be switched on. When the cup is
filled to the necessary amount, release the
button (16) «
». Next time the coffee maker
will make the preset amount of ready coffee.
•
Setting the pump operation time for making
two cups of coffee (the button (15) «
») is
similar to settings for one cup.
•
To restore the default setting simultaneously
press and hold the buttons (16) «
» and (14)
«
» for 3 seconds, you will hear sound sig-
nals and the coffee maker will return to the
default settings.
Notes:
–
the default operation time of the pump is
60 seconds (maximal setting time is 2 min-
utes). When setting the pump operation
time the amount of the ready coffee should
be more than 15 ml. Setting of the smaller
amount will not be saved in the coffee mak-
er’s memory.
–
if you need to switch the water supply off
during the coffee making, press the button
(15 or 16) again;
–
successive making of coffee should be per-
formed with 2-3 min intervals;
–
control the tray (6) filling, periodically pour
out the liquid and wash the tray (6). When the
tray (6) is full, the indicator (7) will appear in
the tray grid.
•
Switch the coffee maker off by pressing the
button (13) «
».
•
Wait until the coffee maker cools down and
remove the filter holder (10), turning the
holder (12) handle to the utmost left posi-
tion «
».
IM VT-1509.indd 5
6/17/20 4:39 PM