Instructions for Use
11
5
Unit Installation
Before installing the Co-mix unit, please check that the delivery is complete
(see Table 3) and that the unit and all accessory parts are intact and free
from any signs of transportation damage.
Please retain all packaging for future transportation and storage of
the unit and its accessories.
The Co-mix unit should be installed in a location which meets the following
requirements:
Safe and suitable operating environment (see section 2)
Solid, stable, vibration-free, level working surface
At least 10cm clearance around the unit to adjacent objects and walls
Earthed AC mains power connection (see section 11)
WARNING
Please also observe and abide by the
Unit Installation and
Operating Environment
safety precautions and preconditions
listed in section 2.
Install and test the Co-mix unit using the following procedure:
1. Place the Co-mix unit on the suitably selected working surface (as
specified above), ensuring that the ventilation slots on the underside of
the unit are not covered or blocked.
2. Connect the unit to the AC mains power outlet using the mains power
cord supplied (see section 4).
3. Switch the mains power on at supply outlet first, and then switch the
unit on using the power switch located at the rear of the unit.
4. Carry out a mixing test at the maximum required load and speed (using
the free-style MIX program described in section 6.3.1) to determine if
the grip between the unit and the working surface is sufficient to
prevent the unit from moving.
5. If the surface grip is sufficient, then the Co-mix unit should not be
moved from this installed position.
If the unit needs to be repositioned in the future, then the above installation
procedure should be repeated at the new location.
Summary of Contents for Co-mix
Page 1: ...Instructions for Use...