background image

 

20

7.10 Reduction drive Easy100

 

 

The reduction Easy100 has been projected with an additional bearing to the pinion 
(smaller pulley) to assure that the traction of the belt cannot harm the inside bearings of 
crankshaft; attention what just says, it doesn't implicate that it is possible to bring a 
strong tension to the belt.   
We now consider how to make maintenance to the reduction gear.    
Loosen the screw of 8mm that is on the side of the plate (1), then the back screw that 
the stops the eccentric (2), subsequently to remove tension from the belt, making to 
rotate the eccentric counterclockwise by the screw of 8mm superior (3). Now we can 
remove the 5 screws of 5mm that fix the pinion cover (4) and extract this last.    
The ordinary maintenance of the reduction gear consist: cleaning if necessary the two 
pulleys (small and big) and the belt with belt spray cleaner, verify the conditions of the 
two bearings of the big pulley and of the bearing of the pinion, the condition of usury of 
the belt (lasted average of 100-150 hours).   
A last important shrewdness consists in the measurement of the housing where lodges 
the bearing of the pinion. In origin the measure of the center is of 22.00mm. When this 
diameter, cause rubbing will reach or overcome the measure 22.20mm, it will need to 
replace the pinion (of the same dimension, branded on the frontal part 
40/41/42/43/44/45 mms). From our experience, the measurement of the center of the 
bearing must have effected every 25 hours.   
The assemblage of the system reduction must be done, following the inverse sequence, 
therefore: insert the pinion cover (4), stop the relative screws of 5 mms, give tension to 
the belt through the central screw in clockwise sense (3), stop the eccentric with the side 
and back screw (2-1).   

 

 

The tension of the belt transmitted through the central bolt of 8mm (3), doesn't have 
to be excessive.   
To avoid this drawback use a torque wrench regulated to 9-10 Nm making rotate the 
eccentric in clockwise sense. Attention: check before that the eccentric is free in its 
rotation. 

 

 

 

7.10 / reduction drive Easy100 

 

Summary of Contents for Easy100

Page 1: ...pe vittorazi motors Sito web www vittorazi com Owner s manual Last update October 2007 Model Vittorazi Easy100 Model Vittorazi Fly100evo All the indications writes in the charts of this manual will be...

Page 2: ...g new horizons 6 0 Specifications and technical data 7 0 Maintenance 7 1 Ignition coil and spark plug 7 2 Check and cleaning carburetor 7 3 Reed valve 7 4 Gaskets 7 5 Exhaust silencer 7 6 Rubber mount...

Page 3: ...he claim the serial number XXXX of the motor that you find under the system carburetor some photos if you think will be necessary You find the direct contacts of the factory in the first and in the la...

Page 4: ...on the ground take off landing watch out that nobody draws near to the propeller in rotation A good safety distance is 50 meters for all directions of projection of the propeller and 20 meters for th...

Page 5: ...completely Now gently screw the bolts up to the end Be sure that the bolt are proper for the propeller therefore the threads of the bolts are inserted at least 10mm in the hub Now to tighten the bolt...

Page 6: ...ember measure material of the propeller and model of the motor The use of a not conform propeller or the use of a propeller Vittorazi united to a wrong reduction ratio brings immediately end of the wa...

Page 7: ...nk of the aircraft filter the mixture Be sure that the tank for the transport gasoline filter and funnel is perfectly always clean We advise only oil of good quality certified and full synthetic no oi...

Page 8: ...th a minimum of throttle If the circuit of fuel is on pressure and the motor is warm it won t be necessary to make pressure on the primer bulb and valve Always watch out for the propeller during the s...

Page 9: ...assemblage and the optimal carburetor setting Chart 4 5 Carburetor setting Vittorazi Easy100 Vittorazi Fly100evo Screw L from 1 4 to 1 3 of turn from 1 4 to 1 3 of turn Screw H from 1 1 8 to 1 1 4 of...

Page 10: ...y of gasoline that arrive to the motor is poor therefore the opening of the screw is lower in comparison to the indications of the chart will probably occur breakups as seizures overheatings fusions o...

Page 11: ...skilled person The chapter or paragraph is reserved to the manufacture dealer or center assistance Vittorazi If you are our collaborators we invite you to write to our e mail address and get the integ...

Page 12: ...motor won t be optimal with these regulations but you will get a good break in and a guarantee of duration for the organs of the motor The first starting of the motor must be made to the ground on sh...

Page 13: ...lug with the same type and gradation at the end of the break in because the quantity of fuel and oil in excess could have decreases notably the duration of it Chart 5 1 NORMAL OPERATION Vittorazi Easy...

Page 14: ...atio 1 3 3 1 3 65 1 4 Clutch centrifugal adjustable Max speed 9 400 9 600 RPM Max speed 9 400 9 600 RPM Thrust 58 kg with prop 125cm Pilot up to 90 100kg Thrust 58 kg with prop 125cm Pilot up to 90 10...

Page 15: ...ar The spark plug can last years or to stop working after some minutes if the shrewdness are not followed We advise not to leave the motor idling for some minutes and accordingly to flood it We advise...

Page 16: ...00 hours of use or once for year After some months the membranes of an unused motor can become stiff to contact with the gasoline or can bend in the normal use losing their peculiarity to oscillate an...

Page 17: ...assemblage of the new soundproofing material Add as denoted in the figure 7 5 1 and 7 5 2 a sealing paste resistant to high temperatures on the points of junction fix two new rivets in the original p...

Page 18: ...earranged provided of patience manually in the original position In the figure 5 freed the pulley is shown the spooling spring Assemblage add grease to the spooling spring and the pivot where slides t...

Page 19: ...s You remember the sequence and the position of all the components of the starter Once assembled pulley cammes springs and cover you insert the screw and verify the sliding of the system You load thro...

Page 20: ...he bearing of the pinion the condition of usury of the belt lasted average of 100 150 hours A last important shrewdness consists in the measurement of the housing where lodges the bearing of the pinio...

Page 21: ...eel and ignition timing 7 14 Crankshaft crankcase bearings The chapter or paragraph is reserved to the manufacture dealer or center assistance Vittorazi If you are our collaborators we invite you to w...

Page 22: ...Reed valve Checkup Substitution Soundproofing material silencer Optional substitution Necessary substitution O ring exhaust Substitution Spark plug Substitution Gaskets Substitution Piston ring Substi...

Page 23: ...m 9 10 Nm Screws or nuts of 8mm 25 27 Nm Screws carbon propeller of 6mms 4 5 Nm 1 Kgm 9 81 Nm Tools of measurement Centesimal caliper Feeler from 0 05 to 1 00 mms Torque wrench scale 2 10 Nm Scale 8 6...

Page 24: ...e motor with the starting or handly Dry the spark plug The spark plug has soot in the electrode Clean it with an iron brush or replace it The cap of the spark plug is not well installed with the cable...

Page 25: ...ater or other liquids it is dirty Void the tank and replace it The gasoline in the tank has a wrong percentage of oil Void the tank and replace it Aspiration of air from the circuit tank bulb filter c...

Page 26: ...plug has soot in the electrode Clean it with an iron brush or replace it The cap of the spark plug is not well installed with the cable Checkup or replace the cap The electric plant Check there are n...

Page 27: ...ity of the motor every motor before being delivered is submitted to a test of verification a simulation of flight made on the thrust bench of about 15 minutes The present warranty remains in vigor for...

Page 28: ...other causes that can influence the performances of the motor an improper use or from maltreatment of the motor wrong regulations or setting omission of generic controls missed cleaning of the carbure...

Page 29: ...______________________________ Client address ____________________________________________________ ____________________________________________________ Client e mail and phone ________________________...

Page 30: ...to directly contact us to our directions under listed We remain all the times to your disposition Registered office via Roma 182 62010 Montecosaro MC Italia Headquarter via Marche 1 3 5 62010 Morrova...

Reviews: