Moster 185 Factory R - Maintenance manual - V1
115
Heat the manual starter side crankcase to 120 °C.
Carry out subsequent operations within a maximum of 5 minutes (application of silicone and
closing of the crankcase).
Carefully add silicone paste (Three Bond 1215) to the crankcase profile as shown in the figure.
Height, width silicone profile: 2 mm x 2,5 mm.
Summary of Contents for Moster 185 Factory R
Page 1: ...MOSTER 185 FACTORY R Maintenance manual release V1 2022 valid for MY20 MY22 versions...
Page 2: ...Moster 185 Factory R Maintenance manual V1 2...
Page 5: ...Moster 185 Factory R Maintenance manual V1 5...
Page 73: ...Moster 185 Factory R Maintenance manual V1 73...
Page 124: ...Moster 185 Factory R Maintenance manual V1 124...
Page 125: ...Moster 185 Factory R Maintenance manual V1 125...