In Screens Required: tallation Screen Steps Required:
Drill holes in wall or ceiling
to match the distance
between mounting holes or
hooks on the screen. Using
a level for drilling holes in
wall is recommended.
Note: Use a 3/32" drill bit for wood stud wall installation, 1/4" bit for concrete
wall installation, or a 3/8" bit for ceiling installation.
Wall Installation: Insert screws in wall
directly for wood studs. If anchors are
needed, press anchors into holes first
and insert screws into anchors. Screw
heads should be spaced about 1/4"
from the wall.
Carefully line up mounting holes on projector screen with screw
heads, and hang in place making sure slots are fully seated
over screw heads.
Step 1
Step 2a
2
Ceiling Installation: Insert hooks (not included) into drilled
holes, and tighten nuts with a wrench until hooks fit securely in
place. Carefully hang projector screen on hooks using the pre-
installed metal rings.
Step 2b
Operation Screen Steps Required:
Step 1
Plug the power cable into a standard
AC wall outlet.