background image

 

 

VXF1GP2R 

INSTALLATION GUIDE

 
 

PAGE 1 of 2

 

BEFORE BEGINNING YOUR INSTALLATION 

Read through the instruction guide before getting started with the installation. Professional installation is recommended for 
this product. 
 

 

 

CONTENTS

 

  Single Gauge Black Powder Coated Metal Dash Panel 

  Two 3-Position Momentary Rocker Switches (Pre-installed) 

 

SAFETY INSTRUCTIONS 

  Make sure your battery ground is detached before getting your installation started. 

  Employ equipment for eye protection during drilling operations. 

 

 

 

 

IMPORTANT: 

If the vehicle is dropped or raised too fast when activating the valve using the switch, a flow control 

valve (not provided) can be installed to reduce the air intake or exhaust of the air spring.

 

ROCKER SWITCH WIRING AND PANEL INSTALLATION 

  Connect the "two lines" connector to the positive (+) wire 

of the air valve that is going to fill air into the air spring. 

  Connect the "O" connector to the 12V, you may use the 

same wire that you used to connect the positive wire of 
the gauge's bulb. 

  Connect the "one line" connector to the positive (+) wire 

of the air valve that is going to dump air from the air 
spring. 

  Install your air gauge on the panel. 

 

Using the dash panel's screw holes as a template mark 
the screws hole location on the surface to be installed 
and secure the panel with two screws (not provided).

 

 

 

Reviews: