Equipment Overview
Eccellenza Pod
18
8.
To install the front panel, install notch at the bottom on the panel onto the lower
post on the right wall of the machine.
9.
Connect the three product hoses to the three spouts on the bottom of the front
panel.
- Powder Hose
- Coffee Hose
- Hot Water Hose