background image

AURA

3. Insert the roll of soundproofing mat into the ventilation pipe.

Before inserting the soundproofing mat, adjust the length of the roll 

with regard to the cartridge size, the inner element and the outer 

hood. To adjust the length, insert the cartridge into the ventilation 

pipe and cover the ventilation pipe with the inner grille. Roll up the 

sound insulation mat with the paper side facing outwards and adjust 

it to the diameter of the ventilation pipe. Push the roller into the 

ventilation pipe as far as it will go against the cartridge.

Do not remove the protective paper layer! 

Ventilation system with external grille
Mark point 1 on the sound insulation mat at the level of the edge of the 
ventilation pipe.

From point 1, draw a line with a length of 20 mm (2 ") and mark 

point 2. Cut off the protruding part of the sound insulation mat.

Insert the adjusted roll of the sound insulation mat into the 

ventilation pipe.

Do not use glue to fix it.

50 mm (2 ")

2

1

1

Ventilation system with the outer hood (optional)

Mark point 1 on the sound insulation mat at the level of the edge 

of the ventilation pipe and cut off the protruding part of the sound 

insulation mat.

Insert the adjusted roll of the sound insulation mat into the 

ventilation pipe.

Do not use adhesives to fix it.

1

4. Insert the ventilation pipe into the wall opening.

Insert the ventilation pipe into the wall with a minimum slope of 3 

mm downwards using the wedges. Insert the ventilation pipe into 

the wall with a minimum slope of 3 mm downwards using the 

wedges.

Fill the voids between the ventilation 

pipe and the wall opening with

Assembly foam.

min 3 mm

Styrofoam wedge

5. Guide the cable through the cable entry and attach the rear of the inner element. Insert the cartridge into the vent tube. 

Disconnect the connector on the power lead of the cartridge and connect it to the counterpart of the power lead on the 

control panel in accordance with the connection diagram on page 12. Connect the parts of the terminal strip.

6. Insert the front cover of the inner element and attach the outer ventilation hood.

Outside ventilation hood

(optional)

Back of the
Interior element

Front cover of
Interior element

The assembly of the outer hood is shown in the assembly instructions for the ventilation hood. 10

www.vlano.de

Summary of Contents for AURA

Page 1: ...OPERATING MANUAL AURA Reversing single room ventilation system with heat recovery ...

Page 2: ...nical properties and scope of delivery of the device at any time No part of this publication may be reproduced transmitted stored in an information search system or translated into any other language in any way without the prior written consent of the company SAFETY REGULATIONS Read these operating instructions carefully before installing the device When installing and operating the device the req...

Page 3: ...ower supply In the event of noise or smoke development immediately disconnect the device from the power supply and contact customer service to contact Fire and explosive substances must be kept away from the device Do not open the device during operation Do not direct air escaping from the device at sources of fire If the device is in continuous operation regularly check the security of the assemb...

Page 4: ...n system is designed for continuous operation with a permanent power supply The pumped medium must not contain any explosive or flammable substances chemical vapors sticky substances fibrous substances dust soot Contain oil particles or other harmful substances such as poisons pathogens etc SCOPE OF DELIVERY number Surname AURA AURA DUO Ventilation pipe Sound absorbing material cartridge Interior ...

Page 5: ...15 9 8 4 30 18 15 9 50 29 25 15 G3 option F8 15 5 to 40 105 29 1 0 21 0 5 20 0 5 12 0 3 41 2 5 92 15 9 15 9 30 18 30 18 50 29 50 29 filter Fluid temperature C F Sound pressure at 1 m distance dB A Sones Sound pressure at 3 m distance dB A Sones Exterior noise insulation dB A Sones E ffi ciency of heat recovery 21 0 5 12 0 3 27 0 7 18 0 4 27 0 7 18 0 4 29 1 0 20 0 5 Length of the ventilation pipe wal...

Page 6: ...t the air flow and prevent the penetration of water and coarse foreign bodies into the ventilation system STRUCTURE OF THE VENTILATION SYSTEM Outer hood Protects the ventilation system against the ingress of water and foreign bodies There is a matching outer hood for every model of the ventilation system Sound insulation mat Sound insulation mat for damping of Ensures outside noise cartridge Consi...

Page 7: ...room via the ceramic heat exchanger The exhaust air warms the heat exchanger and transfers the heat energy and humidity In 70 seconds after the heat exchanger begins to heat up the ventilation system switches to supply air mode Cycle II The fresh cold outside air flows over the heat exchanger and extracts the moisture and stored heat from it until room temperature is reached The heat exchanger is ...

Page 8: ...ute to the rear of the power lines necessary power lines control panels and disconnect the terminal strips Shut down you at at the 4th Press the display of the control panel on the frame until it clicks into place to secure it with a latch and cables to the mounting location cover from the rear To fi x the back of the control panel in of the control panel and assemble Make sure that it complies wit...

Page 9: ...visable to make preparations for laying the power cable and other cables in the wall when drilling the core holes The size of the core hole and the minimum distance to the surface e g to the wall ceiling or window as well as the minimum distance between the ventilation systems is shown below min 500 mm Ø 180 mm min 500 mm min 1 m min 1 m 2 Prepare the ventilation pipes of the required length Measu...

Page 10: ...nsulation mat at the level of the edge of the ventilation pipe and cut off the protruding part of the sound insulation mat Insert the adjusted roll of the sound insulation mat into the ventilation pipe Do not use adhesives to fix it 1 4 Insert the ventilation pipe into the wall opening Insert the ventilation pipe into the wall with a minimum slope of 3 mm downwards using the wedges Insert the vent...

Page 11: ...ccordance with the current consumption of the ventilation system see table on page 5 When selecting the appropriate cable cross section the type of conductor the maximum temperature insulation length and type of routing of the conductor must be taken into account The selection of the signal cable must be based on the following criteria Use only shielded power lines The cable cross section depends ...

Page 12: ...tion level The display shows these parameters Current ventilation level Current operating mode Operating status of the timer ON OFF Need for filter change or maintenance according to the filter timer factory setting 90 days Alarm shutdown of the ventilation system in the event of engine failure If the ventilation system is switched off the set parameters are saved in the non volatile memory of the...

Page 13: ...edium ventilation level High ventilation level timer Parameter setting with the keys or 4 hours in the high ventilation level Switch off the timer for 8 hours in the low ventilation level After the set time has elapsed the ventilation system returns to the previously set one Ventilation level back Operating mode Parameter setting with the keys Heat recovery ventilation or When installing two venti...

Page 14: ...on level Setting the ventilation level Parameter setting with the buttons Set the value 5 or 6 Return to the user menu Press the key The main window is automatically returned 20 seconds after the last time the repeatedly until a main window is displayed in the user menu Button on the control panel 7 Alarm indicator Display is shown in the event of a motor failure 8 Switch off the ventilation syste...

Page 15: ... The ventilation system runs exclusively in supply or exhaust air mode When installing two ventilation systems the air flow direction is determined by the external connections see connection diagram on page 12 Timer control buttons 4 hours in the high ventilation setting 8 hours in the low ventilation setting After the set time has elapsed the ventilation system returns to the previously set venti...

Page 16: ... After the set time period for filter change 90 days has elapsed the filter change display appears on the display Wash the filters and let them dry completely Insert the dry filters into the ventilation pipe Cleaning with a vacuum cleaner is also permitted To reset the filter timer press the button and hold it for 4 5 seconds The filter life is 3 years Contact your ventilation system dealer for ne...

Page 17: ...en starting the ventilation system Low set ventilation level of the fan Set a higher ventilation level Low airflow Dirty filters dirty fan or Heat exchanger Clean or replace the filter Clean the fan and the heat exchanger Loud noise vibrations Dirty impeller Clean the impeller STORAGE AND TRANSPORT REGULATIONS The device in its original packaging in a ventilated room at a temperature of 5 C 41 F t...

Page 18: ...device dismantled by the consumer Incompatibility of the model or brand of the device with the information on the packaging and in the operating instructions Failure to technical maintenance of the device by the consumer in due time In the event of external damage to the housing and internal units caused by the consumer except for external changes to the device that are necessary for installation ...

Page 19: ...______ is mounted and connected to the power grid according to the requirements of this Operating instructions attached Company name address phone Surname first name of Fitter Installation date signature The assembly of the device complies with all applicable local and national building codes electrical and technical norms and standards The device works perfectly as from the manufacturer Assembly ...

Page 20: ...VLANO GmbH Maysweg 10 D 47918 Tönisvorst www vlano de e mail info vlano de Vlano127 1DE 01 ...

Reviews: