Maintena nce plan
76
WBV.PU.002.EN VX215QD V2.0
Every 2000 operating hours, at least once a year:
•
Retighten the bolts and screws fastening the pump connectors
•
Retighten the bolts and nuts securing the machine (without base)
•
Retighten the bolts and nuts fastening the motor and the machine on the base
•
Check fixed coupling of coupling guard (base C)
•
Check pump/motor (coupling) orientation (base C)
•
Change the buffer or quenching fluid
•
Change the gear oil
12.3 Additional maintenance intervals for pumps with belt drive
See also “Technical information for belt drives TINF.PU.020.xx”.
Before start-up and after long periods of shutdown:
Check belt tension and belt orientation
After 0.5 to 4 operating hours:
Check belt tension
Every 6 months:
•
Check belt tension
•
Check belts and pulleys for wear. In the event of clear signs of wear, check the belt orientation.
ATTENTION!
To avoid adhesion of the mechanical seal ring surfaces, the shaft on new machines with a mechanical seal
with the mating materials SiC-SiC that are not started up immediately needs to be rotated (at least one
revolution) every two months.