4
TOOLS AND MATERIALS REQUIRED
FOR INSTALLATION
TOOLS
Ŗ
Pencil
Ŗ
6 ft/2m Folding Rule or Tape Measure
Ŗ
Tin Snips
Ŗ
Drill: Hand or Electric
Ŗ
1/8”/3mm dia. Drill Bit (for sheet metal screws)
Ŗ
Screwdrivers (blade and Phillips type)
Ŗ
19mm socket or wrench
Ŗ
Safety Glasses
Ŗ
Gloves
MATERIALS
(NOTE: The following items are NOT included with your stove)
Flooring Protection:
CUURGEKſGFUGGR
age 7)
Chimney Connection: 6”/152mm dia. minimum 24 MSG black or
26 MSG blue steel straight stove pipe or elbow(s).
1/2”/13mm Sheet Metal Screws
Chimney: Existing
Ŋ
Code-approved Lined Masonry Chimney
or
Ŋ
Inside Dia. manufactured chimney listed to UL 103 HT
(US) or ULC-S629 (CDN).
Furnace Cement (manufacturer recommends Rutland Code 78
or equivalent)
CAUTION: STOVE IS HEAVY. MAKE SURE YOU
HAVE ADEQUATE HELP AND USE PROPER
LIFTING TECHNIQUES WHENEVER MOVING
STOVE.
1. Uncrate the stove and remove all cardboard and
styrofoam packing materials and protective poly
bag. Remove ash drawer and legs from inside
ſTG
box. (Save packing materials for further assembly.)
NOTICE: DO NOT remove ceramic blanket ma-
terial
from inside stove pipe opening (
ſ
gure 1).
This blanket provides an air seal on the side walls
of the stove to direct combustion gasses over the
secondary combustion tubes before exiting via the
chimney.
DO NOT REMOVE the ceramic blanket
or your stove will not operate properly.
2. Stove may be lightened during installation of legs by
removing
ſ
re brick. Note position and arrangement
of bricks. Firebrick & Ash Cover MUST be replaced
before use. DO NOT USE with missing or cracked
ſTGD
rick.
3. Place
ƀCVVGPGF
carton on
ƀQQT
and lay the stove on
its side or back.
4. Remove mounting hex n
WVUHTQOUVWFUſIWTG
.
5. Position legs on each corner and secure with hex
nuts. Tighten securely.
Figure 1 – DO NOT remove ceramic blanket from
inside stove pipe opening. This is NOT packing
material but an integral component of the stove
combustion system.
6. Carefully lift the stove into an upright position.
7.
4GRNCEGſTGD
rick and ash cover.
8. Install ash drawer beneath stove onto installed
supports.
9. For Optional Blower Assembly, note the position of
the blower opening in the rear of the stove.
10. Place blower gasket
onto blower assembly
so as not to obstruct
the air
ƀ
ow from the fan
ſIWTG
11. Mount the blower as-
sembly to the back
of the stove aligning
the fan opening to the
opening in the back
of the stove. Secure
with four sheet metal
screws.
12. After assembly, check
to make sure
ſTG
brick
continued on next page
DO NOT
REMOVE!
Figure 2 – Attach Legs to Stove Body
Figure 3
Blower Option
ASSEMBLY INSTRUCTIONS