5
TOOLS AND MATERIALS NEEDED FOR INSTALLATION
You will need a drill with a 1/8” bit to install sheet metal screws into connector pipe. A 5/16” socket/wrench
or screw driver to install pedestal trim, and blower assembly described below. A 1/2” socket/wrench to install
fl
ue collar. A non-combustible
fl
oor protector as speci
fi
ed in this manual. All chimney and chimney connector
components required for your particular chimney installation. For mobile homes, see page 13.
ASSEMBLY
Flue Collar Assembly:
1. Mount the
fl
ue collar to the top of the unit as shown using the (3) 5/16-18 x 1-1/2 bolts, (3) washers, and
(3) weld
tabs provided in the parts box.
Firebrick Con
fi
guration:
1. Replace the Firebrick as shown in the illustration below.
Brick Con
fi
guration
HEATER
TOP
WELD
TAB
5/16-18 x 1-1/2
BOLT
Side view of
fl
ue collar
mount to heater top
Summary of Contents for VG200
Page 23: ...23 Notes ...