FIREBOX BRICK REPLACEMENT
This furnace comes from the factory with the
fi
rebrick in-
stalled. However, if brick replacement is necessary, fol-
low these instructions. Before furnace operation, remove
the brick retaining strip. This piece is used during ship-
ping to reduce brick damage.
There are 6 full brick and 1 half brick per side. Install the
half brick
fi
rst by putting the bottom of the brick in
fi
rst
and let it rest against the
fi
rebox side and
fi
re grates.
Then slide it to the rear. After that, install the #2, #3, #4,
#5 & #6 brick, sliding the 6th brick forward to allow for the
7th brick. Repeat for opposite side.
NOTE: Prior to operation, be sure to remove the brick
retaining strips.
WIRING DIAGRAM
FIREBRICK AND BAFFLE REPLACEMENT
BAFFLE/BRICK REPLACEMENT
If baf
fl
e replacement is necessary, slide the baf
fl
e out un-
til you can access the nuts thru the
fl
ue outlet. Once the
nuts have been removed, slide the baf
fl
e off the rod and
thru the opening in the
fi
rebrick. You may have to remove
one of the
fi
rebrick to make baf
fl
e removal easier.
There are 4 full brick and 1 half brick in the top of the
furnace. Install the brick by inserting one end of the brick
angled upward and then allowing the opposite end to rest
on the
fi
rebox lip. Lay the brick between the spacer and
fi
rebox back. Slide the baf
fl
e to the rear and let it rest on
that half brick. After installing brick #2 in the front, install
#3 and slide it under the baf
fl
e. Finally install bricks #4
and #5.
All electrical connections should be done by
a quali
fi
ed electrician.
NOTE: The extra brown wire on the fan
center has no use. It should be capped off or
removed.
The conduit may be cut shorter to provide a
cleaner installation.