Installation & Start-up – HES Series
5
Installing Your Tube-Ice Machine
! WARNING !
Only service personnel experienced and certified in refrigeration and qualified to work
with high voltage electrical equipment should be allowed to install or work
on this Tube-Ice
®
machine.
! WARNING !
Important Notice.
The Warranty Registration / Start-Up Form must be completed and returned
to Vogt Tube-Ice
®
to initiate and assure a full warranty. A postage paid
envelope is provided or you may fax the report to 800-770-8648.
Bin Installation.
Set the bin on solid, level footing. Inside the bin you will find the four
legs. Screw these legs to the bottom of the bin. You can make MINOR leveling adjustments by
using these legs as leveling screws, as outlined in the manufacturer’s instructions.
Setting the ice machine on the ice bin.
Once the ice storage bin is level, the Tube-Ice
®
machine can be elevated and placed on the bin top. Using the dimensions in FIGURE-1 below,
mark the machine footprint on the bin top by measuring over from the ice chute opening.
Note:
Above machine footprint shown with stainless casings
Machine footprint with no casings: 40” X 26”
Machine footprint with plastic casings: 41” X 27 1/2”
FIGURE - 1
Ice Bin to Machine Layout
Summary of Contents for HE S Series
Page 2: ...Installation Start up HES Series 2 Blank Page ...
Page 12: ...Installation Start up HES Series 12 FIGURE 8 Typical Space Diagram ...
Page 26: ...Installation Start up HES Series 26 FIGURE 16 Piping Schematic Air Cooled ...
Page 27: ...Installation Start up HES Series 27 FIGURE 17 Piping Schematic Water Cooled ...