10TA Service Manual
START-UP AND OPERATION
4/14/14
5-1
Start-Up and Operation
Refrigeration System Review
The refrigeration system uses R-22 or R-404a refrigerant, a
compressor, a refrigerant float switch, expansion valve, a flooded evaporator (freezer), and warm gas
defrost. Following the schematic, you see that during the freeze period of the machine’s cycle, the
condenser discharge gas leaves the compressor and goes to the condenser where it is condensed into
liquid by the removal of heat by either air or water passing through the condenser. A reservoir of
liquid is accumulated in the receiver and flows as required, passing through the thawing chamber (a
lower separate section of the freezer) then the filter/drier. The liquid feed solenoid valves (“A1” and
“A2”) being open during the freeze cycle allows the liquid to be metered by the float switch as the
“A1” valve opens and closes in response to the refrigerant level in the freezer. Wet refrigerant
floods the evaporator and is in contact with the outside of the ice-making tubes in which water is
being circulated. The heat contained in this water passes through the wall of the tubes, lowering the
temperature of the water, causing it to freeze and form a long tube of ice that adheres to the inside of
each of the freezer tubes. The flowing water keeps the accumulated ice clear by washing separated
solids down into the sump area of the water tank.
The wet suction gas leaves the freezer and any remaining liquid droplets are removed by the
accumulator and suction line heat exchanger. The dry gas enters the compressor and is compressed
then discharged to the condenser completing the cycle.
As the ice is formed in the freezer, the suction pressure steadily reduces until it causes the freezer
pressure switch to close, initiating the harvest period.
During the harvest period, the thawing gas solenoid valve, (the “D” valve), is open allowing the
warm high pressure gas to enter the freezer. This heat melts a thin film from the outside of the ice,
reducing the diameter and letting it fall free from the freezer tubes. This period lasts approximately
2 1/2 minutes.
Refrigerant Charge
Included with the machine is the required charge (approximately 500 lbs.) of
Refrigerant (R-22 or R-404a, depending on the model), which has been isolated in the receiver
(15R). Before shipment of the machine, the compressor service valves (34), (35), and the stop
valves in the various lines to the condenser and receiver have been closed. These valves are tagged
with instructions that the valves are to be opened prior to start-up of the machine. Before opening
these valves, it is advisable to check all joints for leaks that may have developed during shipment. If
no leaks are present, a positive pressure should show on the suction and discharge pressure gages.
They should indicate a pressure approximately equal to the ambient temperature. This pressure can
be found using the pressure temperature chart for the applicable refrigerant, TABLE 11-7.
If it should ever become necessary to add refrigerant to the system, charging valve (28) is provided
for this purpose. Through this valve, refrigerant can be added in liquid form. See “Adding
Refrigerant." The compressor crankcase heater must be energized for a minimum of two hours prior
to starting and running the compressor.
Summary of Contents for P18FXT
Page 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M08 10TA Model ...
Page 10: ...10TA Service Manual TABLE OF CONTENTS vi BLANK ...
Page 20: ...10TA Service Manual INTRODUCTION 4 14 14 1 10 BLANK ...
Page 40: ...10TA Service Manual INSTALLING YOUR TUBE ICE MACHINE 4 14 14 3 18 BLANK PAGE ...
Page 50: ...10TA Service Manual START UP AND OPERATION 4 14 14 5 6 BLANK ...
Page 60: ...10TA Service Manual ELECTRICAL CONTROLS 4 14 14 6 10 BLANK ...
Page 112: ...10 8 10TA Service Manual OPTIONS AND ACCESSORIES BLANK ...
Page 120: ...10TA Service Manual TABLES CHARTS 7 2 14 11 8 BLANK ...