05TA Service Manual
INDEX
8/13/01
12-1
12. Index
A
A Valve (Liquid Feed) ---------------------------------- 4-1, 5-1, 9-12
Accumulator ------------------------------------------------------4-1, 5-1
Adding Refrigerant-----------------------------------------------------5-4
Air - cooled Condenser Wiring (3 phase) ---------------------- 3-12
Air-Cooled Condenser ------------------------------------------------9-9
Air-Cooled Condenser Data -----------------------------------------3-9
Air-Cooled Condenser Installation ----------------------------------3-7
Air-Cooled Piping Schematic----------------------------------------4-4
Air-Cooled Units--------------------------------------------------------9-4
Allen-Bradley Switch --------------------------------------------------9-2
Assembly Drawing, Air-Cooled -------------------------1-4, 1-5, 1-6
Assembly Drawing, Water Cooled --------------------1-7, 1-8, 1-9
Automatic blowdown --------------------------------------------------9-1
B
Basic Product Warranty --------------------------- inside back cover
Bearing, Cutter ------------------------------------------------------- 9-16
Bill of Lading ------------------------------------------------------------2-1
Bin, Single Thermostat Wiring------------------------------------ 3-13
Bin, Thermostat Installation---------------------------------------- 3-13
Blowdown ---------------------------------------------------------------9-1
Burnout, Compressor ----------------------------------------------- 9-11
C
Capacity Ratings ----------------------------------------------------- 11-4
Centrifugal Pump ---------------------------------------------------- 9-12
Charging Refrigeration Systems------------------------------------1-2
Check Valve-------------------------------------------------------------4-2
Checklist, Daily ---------------------------------------------------------7-7
Checklist, Installation Review ------------------------------------- 3-14
Checklist, Start-up -----------------------------------------------------5-2
Chemical Cleaning-----------------------------------------------------7-4
Circuit Breaker, Cutter ------------------------------------------------6-2
Circuit Breaker, Pump ------------------------------------------------6-2
Circulating Water Pump Motor------------------------------------ 9-12
Clean/Ice Switch -------------------------------------------------------6-2
Cleaning Procedure ---------------------------------------------------7-1
Compressor -------------------------------------------------------------7-5
Compressor Crankcase Heater -------------------------------------9-4
Compressor Lubrication ----------------------------------------------7-5
Compressor Motor Burnout ---------------------------------------- 9-11
Compressor Unloader----------------------------------------------- 9-13
Compressor, Contactor -----------------------------------------------6-2
Compressor, Motor Protection --------------------------------------9-5
Condenser Cleaning------------------------------------------- 7-4, 9-10
Condenser Fan Contactor (FC) -------------------------------------6-2
Condenser Fan Switch -----------------------------------------------9-4
Condenser Piping (Cold Weather Valve Kit)------------------- 3-11
Condenser Water Usage ------------------------------------------ 11-5
Condenser, Air-cooled Cleaning ---------------------------------- 9-10
Condenser, Air-cooled Heat Rejection ----------------------------3-9
Condenser, Pressure Switch (CPS) -------------------------------9-4
Condenser, Water Cooled Maintenance ------------------------- 7-4
Control Circuit Protection-------------------------------------------- 9-9
Control Panel----------------------------------------------------------- 6-1
Control Panel Parts --------------------------------------------------- 6-2
Control, Relay (CR)--------------------------------------------------- 6-2
Cooling Tower --------------------------------------------------------- 3-1
Crankcase Heater ------------------------------------------------7-5, 9-4
Crushed Ice Production --------------------------------------------9-20
Cutter & Bearing Removal/Installation---------------------------9-15
Cutter, Assembly -----------------------------------------------------9-17
Cutter, Bearing--------------------------------------------------------9-15
Cutter, Bearing Support --------------------------------------------9-15
Cutter, Disc Assembly -------------------------------------- 9-17, 9-19
Cutter, Drive Parts ---------------------------------------------------9-18
Cutter, Gear Reducer --------------------------- 7-4, 9-9, 9-14, 9-18
Cutter, Motor ----------------------------------------------------------9-14
Cutter Assembly------------------------------------------------------9-17
Cutter Parts (crushed Ice) -----------------------------------------9-19
Cutter/Water Tank Parts (cylinder ice)--------------------------9-17
D
D Valve (Thawing Gas) -------------------------------------- 4-1, 9-12
Daily Check List ------------------------------------------------------- 7-7
Drive gear--------------------------------------------------------------9-18
E
Electrical Connection------------------------------------------------- 3-4
Electrical Schematic All Voltages 50-60 Hz. -------------------- 6-3
Electrical, Controls---------------------------------------------------- 6-2
Enclosure --------------------------------------------------------------- 6-1
Energy Saving --------------------------------------------------------- 1-1
Equivalent Feet Due To Friction ----------------------------------3-10
F
Fan Contactor (FC) --------------------------------------------------- 6-2
Filter/Drier--------------------------------------------------------------- 4-1
Float Switch ------------------------------------------------------------ 9-1
Float Valve (Make-Up Water) -------------------------------------- 9-1
Foundation Layout ---------------------------------------------------- 3-4
Freeze Period ---------------------------------------------------------- 4-2
Freeze-Up Due To Extended Freezing Period------------------ 8-4
Freeze-Up Due To Ice Failing To Discharge-------------------- 8-5
Freezer ------------------------------------------------------------------ 4-1
Freezer Pressure Switch -------------------------------------------- 9-2
Fuses (FU1 and FU2)------------------------------------------------ 6-2
G
Gear Reducer ---------------------------------------------------------- 9-9
H
Hand Expansion Valve ----------------------------------------------- 9-1
Harvest Period --------------------------------------------------------- 4-2
Head Pressure --------------------------------------------------------- 9-4
Summary of Contents for TUBE-ICE 05TA
Page 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M06 05TA Model ...
Page 82: ...05TA Service Manual SERVICE OPERATIONS 8 13 01 9 18 FIGURE 9 10 Cutter Drive Parts ...
Page 95: ...05TA Service Manual OPTIONS AND ACCESSORIES 8 13 01 10 11 FIGURE 10 3 Control Panel Parts ...
Page 97: ...05TA Service Manual OPTIONS AND ACCESSORIES 8 13 01 10 13 FIGURE 10 4 Wiring Schematic ...
Page 103: ...05TA Service Manual TABLES CHARTS 8 14 01 11 1 11 Tables Charts ...