05TA Service Manual
START-UP AND OPERATION
8/13/01
5-3
! CAUTION !
The crankcase heater should be energized for a MINIMUM of
2 hours and the crankcase must be free of liquid before
attempting to operate the compressor.
! CAUTION !
FIGURE 5-1
Bottom Portion of Control Panel
Start-Up
Starting the machine in freeze mode:
(NOTE: to start in harvest mode, turn “On/Off” switch to “On”)
1.
Set the “Ice/Clean” switch to the “Clean” position.
2.
Set the “On/Off” switch to the “Off” position.
3.
Push the “Start” button to start the water pump.
4.
The pump can be stopped and started by “Stop” and “Start” push buttons or by the “Ice/Clean”
switch to purge the tubing of air.
5.
When there is good water flow, turn the “On/Off” switch “On”, and the “Ice/Clean” switch to
“Ice”. The machine will then start in a harvest (thaw) period with the compressor running.
6.
At the termination of the harvest (thaw) period, the machine will begin the freeze period.
Be sure to observe several cycles of ice production to confirm the satisfactory operation of the
machine.
7.
Complete the remaining part of the “Warranty Registration/Start-Up Report” and return it to
the Henry Vogt Machine Co.
Compressor
Elapsed
Time
Stop
Start /
Manual Harvest
Clean
Off
Ice
0000000
Summary of Contents for TUBE-ICE 05TA
Page 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M06 05TA Model ...
Page 82: ...05TA Service Manual SERVICE OPERATIONS 8 13 01 9 18 FIGURE 9 10 Cutter Drive Parts ...
Page 95: ...05TA Service Manual OPTIONS AND ACCESSORIES 8 13 01 10 11 FIGURE 10 3 Control Panel Parts ...
Page 97: ...05TA Service Manual OPTIONS AND ACCESSORIES 8 13 01 10 13 FIGURE 10 4 Wiring Schematic ...
Page 103: ...05TA Service Manual TABLES CHARTS 8 14 01 11 1 11 Tables Charts ...