SmartCrystal™ Diamond
n ° : MUV140036
Version : A12
USER MANUAL
Date : 11/01/2018
www.volfoni.com
This document is the property of the Co VOLFONI and may not be reproduced or disclosed without permission.
67
Installation and adjustment on the support overview
Several steps to install the
SCD on the Bracket
- Fixing the SCD on the
support with 4 screws.
- Adjustment of the
Horizontal position. SCD
must be as closed as
possible to the lens of
the lens of the projector
- Adjustment of the
vertical position: Beam
light should enter in the
center of the entrance
windows of the SCD.
- Adjustment of the SCD
angle