customersupport@voltlighting.com • 813.978.3700
- 5 -
Thread the stem top onto the
stem and hand tighten until
snug.
Install Stem Top
3
Stem Top
Stem
Install Stake and Conduit
4
Dig a hole in the ground for the conduit runs and the stake. Install the
conduit. Slide the stabilizer grid onto the stake and secure with the
screws. Place the stake over the conduit runs then backfill against the
mounting stake.
Stake
Stabilizer
Grid
Conduit
Ground Level