16
13
Setting voltage point back
to battery mode when
selecting “SBU priority” or
“Solar first” in program 01.
Battery fully charged
48V
49V
50V
51V
52V
53V
54V (default)
55V
56V
57V
58V
16
Charger source priority:
To configure charger source
priority
If this inverter/charger is working in Line, Standby or Fault
mode, charger source can be programmed as below:
Solar first
Solar energy will charge battery as
first priority.
Utility will charge battery only when
solar energy is not available.
Utility first
Utility will charge battery as first
priority.
Solar energy will charge battery only
when utility power is not available.
Solar and Utility
Solar energy and utility will charge
battery at the same time.
Only Solar
Solar energy will be the only charger
source no matter utility is available or
not.
If this inverter/charger is working in Battery mode or Power
saving mode, only solar energy can charge battery. Solar
energy will charge battery if it's available and sufficient.
18
Alarm control
Alarm on (default)
Alarm off