12
Caution!
Pay attention to the slope of the ground and surface to avoid fall
down when moving the equipment.
When the slope is not available, you may need a hoist to
remove the UPS from the pallet.
Preparing two cables. The length of two cables is about 3
meters and the bearing should be at least 1.5 tons.
Fix the UPS with cables. Use the hoist to lift up the UPS and
place it on the ground.
After the UPS is removed from pallet, please inspect the unit and package contents.
Be sure that nothing inside the package is damaged. You should have received the
following items inside of package:
CD
User manual
USB cable
RS-232 cable
3.3
Location
After placing the UPS, please adjust the leveling feet to fix the UPS in position.