VORTICE S.p.A. goal is to attain maximum respect for the environment. To this end, and to facilitate the greatest
efficiency possible for the end client, it avoids the use of unnecessary or excessive packaging as much
as possible, in order to minimise the environmental impact. Unless the purchaser has specific needs or
specific requests that are assessed in each case, the product is supplied on a timber pallet inside a
cardboard box, where necessary, otherwise it is simply placed in the pallet (e.g. aluminium blades), with
parts covered in protective plastic.
The packs must not be stacked.
Avoid damaging the machine's components by being very careful with opening the packaging
Once delivered to the purchaser, they must immediately check that the product is correct and conforms:
No part of the product must be damaged or cracked, or have any other visible defects due to
1)
transportation.
All the components must be in the package.
2)
There must be no signs of chemical attack, damp, stains or anything else.
3)
The CE Mark and pictograms must be included, especially:
4)
•
The motor's identity label, which also indicates its characteristics.
Do not dispose of packaging in the environment. It must be deposited at specific collection points and
stored in accordance with the specific environmental disciplines, by the user.
3.1
Handling
The Ceiling Fan is relatively heavy (see weights table) and bulky, and so it must be lifted and handled after having
checked that the necessary, suitable equipment is available. They must have personal protection equipment required
for the task and called for by applicable local norms. Also, given the weight of the machinery, if suitable lifting devices
are not available, the machine and its components must always be handled by at least two people.
In particular:
For unpacking the product, use at least:
GLOVES that are suitably resistant to cuts, perforation and crushing
•
Overalls or approved clothing, type approved in terms of applicable norms
•
Safety footwear
•
Operators engaged in unpacking the ceiling fan must be adequately trained and informed by the user of the elements
and the dangers they pose.
3.2 Operative instructions
Transport the pack that contains the product using adequate equipment, handled / operated by qualified personnel,
a.
to the vicinity of the assembly and/or installation site;
Follow all the instructions given in detail. If a passage cannot be understood, or even if there is some doubt
b.
concerning it, immediately interrupt operations, make the machine and the parts in-volved completely safe, and
ask for clarification. .
Once all UNPACKING operations have been completed, proceed to install in the manner specifi-cally indicated.
c.
The CEILING FAN can be lifted and suspended using the base of the machine as a support. Only lashing and securing
methods may be used that ensure the machine's stability and prevent a risk of it falling during the op-eration. The
area underneath must be cordoned off and kept free of people or objects, until after the fan has been started for the
first time.
3 TRANSPORTATION AND HANDLING
Summary of Contents for Nordik HVSL Super Blade 110 V Series
Page 1: ...NORDIK HVLS SUPER BLADE E SUPER BLADE 110 V Instruction booklet COD 5 571 084 939 23 07 2021 ...
Page 25: ...25 INVERTER MOTOR ELECTRONICS QUICK CONNECTORS ...
Page 28: ...28 Destratification Fan assembly ...
Page 56: ...56 Attachment 2 Electric connection ...
Page 67: ...67 Multi wire diagram for system wiring SINGLE PHASE 85 264V 50 60 Hz ...
Page 78: ......
Page 79: ......