10. First Start-up
Once machine assembly, installation and electrical connection has been completed, power up
the machine and wait about 30 seconds for it to stop its self-diagnosis of default parameters and
to start rotating.
Then check that:
- there are no installation imbalances due to incorrect assembly of the components or latent their
defects.
- there are no metallic noises or sounds coming from the machine itself.
- the motor diagnosis LED flashes every 2 seconds.
- the direction of rotation is clockwise, if viewed from under the destratification fan.