VTI Instruments Corp.
66
EX2500A Web Page Operation
R
ESOURCE
M
ANAGER
C
ONTROL
The
Resource Manager Control
page allows the user to perform various Resource Manager
tasks. From here, the beginning and end of both A24 and A32 spaces can be defined and the
resource manager can be manually run. If any field on the
Resource Manager Control
page is
altered, it should be followed by manually running Resource Manager.
F
IGURE
5-15:
R
ESOURCE
M
ANAGER
C
ONTROL
P
AGE
•
Resource Manager
: allows the user to modify A24/A32 space limits.
o
Run Resource Manager
: clicking the
Run
button will cause resource manager to run.
This may be useful instruments have been added to an extended rack and need to be
identified. There is no need to cycle power to the local rack containing the EX2500A.
o
Start of A24 Space
: to set the starting address of A24 space, enter an address in this
field, click, then click the
Run
button.
o
End of A24 Space
: to set the ending address of A24 space, enter an address in this field,
click, then click the
Run
button.
o
Start of A32 Space
: to set the starting address of A32 space, enter an address in this
field, click, then click the
Run
button.
o
End of A32 Space
: to set the ending address of A32 space, enter an address in this field,
click, then click the
Run
button.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com