background image

3.2. Sectional units CV-P1 and CV-P2 (400V)

Blocks of sectional units are manufactured with the same technology as blocks of compact units (fot. 3). CV-P unit, depending on the type of air treatment process that

is realized, consists of separate functional sections. Each section is marked by means of graphic symbols of functions placed on the inspection panel. Blocks of units are
adapted to realize air treatment processes in following sections:

Air flow, in CV-P1 unit, is forced by double-sided sucking centrifugal drum fan, which is driven by the belt transmission with the tri-phase electric motor having the power

supply voltage 400V. Two fans, which have impellers set on one shaft, and which are driven by the belt transmission with one electric motor, were used in the fan-section
of the CV-P2 unit.

3.3. Side of execution

Suspended units are manufactured in right and left execution (fot. 4). Side of execution is determined by the position of exchangers stub pipes in relation to the direction

of air flow. In case of units with cross-flow exchanger the direction of the air flow in the intake part decides about the side of execution.

4. Delivery, transportation, storage

Units are delivered to the place of installation in the form of separate blocks. Each block of compact units and additional sections of suppression and damper together with

elastic connections for every type of CV-P are packed in separate cartons, whereas blocks of sectional units are protected for the time of transportation with foil and distance
corners made of foamed polystyrene. Unloading from the mean of transport and the transportation on the building site should be done manually, using pallet-truck or forklift.
During transportation of block of units one should pay special attention to lift and lower them gently. It is not acceptable to transport and store the fan-section of CV-P1 and
CV-P2 units placing them on one of side walls of the casing. It may cause the damage of driving system of the fan. It is recommended to transport the fan-section on the
wall, which is opposite to inspection panels.

Directly after the delivery of devices one should check the state of package and verify if all parts are present checking enclosed specifications and waybills.
Any damages resulting from wrong way of transportation and storage are not covered by the guarantee and claims in this matter should be directed to forwarding agent.

Devices should be stored in rooms where:
• maximal relative humidity of air does not exceed 80% at the temperature of 20°C
• temperature of surrounding varies in the range from -20°C to +30°C
• dust, gases and caustic vapours, chemical substances, which have corroding influence on the elements of construction and components of units should not have access

to devices

5. Installation

In standard system CV-P units are installed in horizontal suspended position (position S) or horizontal lying (position N) on the ground. For some functional units there is

also a possibility of installation in vertical position on the wall.

Remark!

The work of CV-P1 and CV-P2 units installed horizontally on the wall (by side - parallel to the ceiling) is forbidden (fot. 5). It is very important to place power supply and
drainage stub pipes of exchangers in the horizontal position. This remark does not concern units CV-P1-V, CV-P1-HE.

5.1. Installation in suspended position S

Installation of units in ventilating air ducting is done using handles for

connection  and  suspending  units,  which  are  mounted  on  sides  of  every
unit.  Use  of  threaded  rods  M8  enables  easy  and  quick  suspension  and
leveling  of  following  sections  of  the  unit  (threaded  rods  M8  are  not
elements of delivery). Self-adhesive seal should be placed in the place of
contact of the unit before the unit is assembled. The seal and screws used
for connecting the unit are delivered in separate package, which is placed
in the fan-section (fot. 6).

CV-P/230V, CV-P/400V

36

Construction, Delivery, transportation, storage, Installation

VTS Clima

ENG

• mixing (recirculation)
• filtration (filters from EU4 to EU9 class)
• heating (water and electric heaters)

• cooling (water and freon coolers)
• heat recovery (cross-flow exchanger)
• suppression
• fan-section

7
6
4
3
2
5
2
3
4

3

4

2

1

The way of connection of functional sections and suspension 
of the unit.

1. Screw M8x35-5.8 Fe/Zn9
2. Washer 8.4 Fe/Zn
3. Spring washer 8.2 Fe/Zn
4. Nut M8-5-I Fe/Zn
5. Suppressing element (e.g. rubber pad)
6. Threaded rod M8
7. Rubber seal

R

Reem

maarrkk:: in the set with the unit elements used for connection 

of sections are delivered only. (positions: 1,2,3,4,7)

water heater

electric heater

Summary of Contents for CV-P/230V

Page 1: ...VOZN DOKUMENTACE KLIMATIZA N CH JEDNOTEK TECHNISCHE UNTERLAGEN VON GER TEN IN FLACHBAUWEISE OPERATION AND MAINTENANCE MANUAL FOR Suspended AIR HANDLING UNITS CV P 230V CV P 400V Poland 81 198 Kosakowo...

Page 2: ...tky CV P1 V CV P1 HW CV P1 HE 230V 20 3 2 Sek n jednotky CV P1 a CV P2 400 V 21 3 3 Strana proveden 21 4 4 D Do od d v vk ka a t tr ra an ns sp po or rt t p p e ec ch ho ov v n n 2 21 1 5 5 M Mo on nt...

Page 3: ...allation in suspended position S 36 5 2 Installation in lying position N on the ground 37 5 3 Installation in vertical position 37 5 4 Place of installation 37 5 5 Connection of ventilating ducts 37 5...

Page 4: ...mora mieszania redukcja poziomu g o no ci t umiki Centrale podwieszane z sekcjami funkcjonalnymi produkowane w dw ch wielko ciach CV P1 zakres wydajno ci powietrza od 500 do 2600 m3 h CV P2 zakres wyd...

Page 5: ...nia oraz kompletno dostawy na podstawie za czonych specyfikacji i list w przewozowych Wszelkie uszkodzenia wynik e z niew a ciwego sposobu transportowania i sk adowania nie s obj te gwarancj i roszcze...

Page 6: ...stosowanie nap du przepustnic za pomoc si ownik w elektrycznych funkcjonuj cych w uk adzie automatycznej regulacji Niezale nie od tego standardowym wyposa eniem przepustnic s d wignie do regulacji r...

Page 7: ...formatorowych lub tyrystorowych Zasilanie pr dem o napi ciu 230V 50Hz nale y wykona zgodnie z obowi zuj cymi przepisami i normami budowlanymi Silnik posiada wewn trzne zabezpieczanie termicz ne w post...

Page 8: ...k nagrzewnicy czy nie s uszkodzone lub nie maj kontaktu z elementami wewn trz sekcji ogrzewania Sprawdzi prawid owo pod cze elek trycznych zgodnie ze schematem elektrycznym pod czenia grza ek elektryc...

Page 9: ...ej eksploatacji 7 1 EKSPLOATACJA I KONSERWACJA Centrale CV P przeznaczone s do pracy ci g ej Zwi zana jest z tym konieczno dokonywania okresowych przegl d w element w i podzespo w kt re ulegaj szybkie...

Page 10: ...dzi stan odkraplacza i tacy ociekowej wraz z systemem odp ywowym skroplin Je eli wymiennik posiada system zapobiegaj cy szronieniu nale y skontrolowa prawid owo zamontowania systemu Zesp wentylatorowy...

Page 11: ...any 8 POMIARY KONTROLNE Po przeprowadzonych przegl dach i zabiegach konserwacyjnych nale y przeprowadzi kontrol parametr w pracy urz dzenia tj pomiar temperatur i wilgotno ci powietrza przed i za elem...

Page 12: ...CV P Clima Top 2 1 CV P1 CV P1 V CV P1 HW CV P1 HE 230 CV P1 V CV P1 HW CV P1 HE 2 2 CV P1 CV P2 3 400 CV P1 500 2 600 3 CV P2 1 300 4 000 3 3 3 1 CV P1 V CV P1 HW CV P1 HE 230 1 U 40 230 50 CV P 230...

Page 13: ...400 CV P2 3 3 3 4 CV P CV P1 CV P2 80 20 20 30 5 CV P1 S CV P1 CV P2 4 CV P1 V CV P1 5 1 S 5 8 CV P 230V CV P 400V 13 VTS Clima RUS EU4 EU9 7 6 4 3 2 5 2 3 4 3 4 2 1 1 8 35 5 8Fe Zn9 2 8 4Fe Zn 3 8 2...

Page 14: ...5 2 N 6 8 5 3 8 5 4 400 5 5 110 5 6 2 7 4 8 4 3 1 4 8 19 5 PWV 5 7 8 10 20 9 10 5 8 12 2 CV P 230V CV P 400V 14 VTS Clima RUS...

Page 15: ...5 9 5 10 12 13 65 20 5 11 CV P1 230 14 220 50 15 CV P1 CV P2 3 400 3 400 50 16 17 5 12 VTS Clima CV P1 HW 230 CV P 230V CV P 400V 15 VTS Clima RUS...

Page 16: ...6 6 1 6 2 18 6 3 4 6 4 6 5 6 6 H 11 6 7 3 400 21 22 23 CV P 230V CV P 400V 16 VTS Clima RUS...

Page 17: ...7 CV P1 CV P2 30 2 1 1 2 7 1 CV P1 1 1 EU 4 2 EU 5 EU 7 EU 9 19 2 4 4 CV P 230V CV P 400V 17 VTS Clima RUS...

Page 18: ...60 4 CV P1 CV P2 50 4 20 P SPZ 21 23 50 22 Taper lock Taper lock CV P 230V CV P 400V 18 VTS Clima RUS...

Page 19: ...8 9 CV A CV D 1 2 3 4 5 6 VTS Clima VTS CLIMA www vtsclima com CV P 230V CV P 400V 19 VTS Clima RUS...

Page 20: ...ektrick chlazen chladi e vodn nebo freonov filtrace filtry vstupn a sekund rn zp tn zisk tepla deskov v m n k sm ovac komora sn en hlu nosti tlumi e Podstropn jednotky z funk n mi sekcemi jsou vyr b n...

Page 21: ...Na ve ker po kozen zap in n nespr vn m zp sobem transportu a skladov n se nevztahuje z ruka a pr vn n roky tohoto charakteru je t eba uplat ovat u p epravce Za zen je t eba skladovat v prostorech ve...

Page 22: ...n m regula n klapky je t eba p ilepit k l mci jednotky samolep c t sn n Regula n klapka 1 se p ipev uje k jednotce pomoc rouben 4 8 x 19 4 po dvou kusech na obou del ch stran ch 5 5 7 7 P P iip po ojj...

Page 23: ...u do motoru ventil toru na dobu trv n servisn ch z krok Rozpojen obvodu nap jen by m lo b t uskute n no na f zov ch vodi ch 5 5 1 12 2 R Re eg gu ulla ac ce e Kompletn regulace kter by m la b t sou st...

Page 24: ...eba p iv t regula n klapku na vstupn stran do jednotky Nespln n t to podm nky m e zp sobit p et en motoru ventil toru p padn jeho trval po kozen Po spu t n ventil toru a postupn m otev r n regula n k...

Page 25: ...strany p vodu vzduchu pro i t n proudem vzduchu z odvodn strany promyt teplou vodou s dodatkem ist c ch prost edk nezp sobuj c ch korozi hlin ku Pro dobrou funkci oh va e mus b t oh va dob e odvzdu n...

Page 26: ...b tich ho vrn n lo isko funguje dob e Usly me li naopak sk pot znamen to e v lo isku je m lo mazu asto se opakuj c kovov zvuk nebo zvuk drhnut upozor uje na po kozen lo iska V takov m p pad je t eba l...

Page 27: ...hald mpfer Die Flachger te mit Funktionsteilen werden in zwei Gr en hergestellt CV P1 Luftkapazit t von 500 bis zu 2600 m3 h CV P2 Luftkapazit t von 1300 bis zu 4000 m3 h 3 Bauweise 3 1 Kompaktflachge...

Page 28: ...t ordnungsm igen Transport und falsche Lagerung zur ckzuf hren sind sind aus der Gew hrleistung ausgeschlossen und die Gew hrleistungsanspr che sind an die Speditionsfirma zu richten Die Anlagen sind...

Page 29: ...ngetrieben An den Seiten der Schaufelfl chen sind Gummidichtungen angebracht Es wird empfohlen Servomoteren die in einem automatisch regulierenden System arbeiten als Antrieb f r die Luftklappen zu ve...

Page 30: ...der Spannung von 230V 50Hz ist gem geltenden Vorschriften und Baunormen auszuf hren Der Motor hat eine innere Thermosicherung in Form eines Thermobimetallkontaktes Die Anschl sse des Motors sind gem...

Page 31: ...Sieder keinen Kontakt mit den Elementen innerhalb der Heizsektion haben 6 5 Wasser und Freonk hler hnlich wie bei den Wassererhitzern sind der Zustand der Rippen sowie die Qualit t und die Richtigkei...

Page 32: ...at ist Am sichersten kann diese T tigkeit durchgef hrt werden wenn die Temperatur der anstr menden Luft um 1 2 Grad die Nulltemperatur bersteigt In solcher Situation soll man den Zulauf des Heizmittel...

Page 33: ...euzstromw rmeaustauscher vor erneuter Ingangsetzung der Zentrale gr ndlich getrocknet werden Au erdem ist der Zustand des Tropfenabscheideres und der Kondensatwanne samt Kondensatabflusssystem zu berp...

Page 34: ...e Drehrichtung des Ventilators kann z B infolge von nderungen in den Elektroleitungen ge ndert werden deswegen muss die Drehrichtung des Ventilators kontrolliert werden 8 Kontrollmessungen Nach Durchf...

Page 35: ...g section reduction of sound level suppressors Suspended units with functional sections are manufactured in two sizes CV P1 air delivery from 500 to 2600 m3 h CV P2 air delivery from 1300 to 4000 m3 h...

Page 36: ...resent checking enclosed specifications and waybills Any damages resulting from wrong way of transportation and storage are not covered by the guarantee and claims in this matter should be directed to...

Page 37: ...lever for hand regulation fitted in standard Installation Self adhesive seal should be attached to the flange of the unit before the unit is fitted The damper 1 should be fastened to the unit by mean...

Page 38: ...ng to diagrams and data included in the connection box and on the data plate of the motor fot 16 Sectional units CV P1 and CV P2 3x400V The motor of the fan is supplied with the current of voltage 3x4...

Page 39: ...ater are not damaged or have any contact with the elements inside the heating section Check the correctness of electric connections according to the wiring diagram showing the connection of electrical...

Page 40: ...very fast bearings V belts the exchange of filters and V belts is the User s obligation Basic technical data of the unit can be found in the Technical Data Card which is given together with every dev...

Page 41: ...aced on the lift panel and the values of tension should be compared with the table below Too big tension of the belt results in overheating and damaging of bearings and overloading of motor Too small...

Page 42: ...the filed of operation of electrical devices 2 The current must not be turned on before the unit is connected to the protection system 3 It is forbidden to do any repair and maintenance activities if...

Page 43: ...n 395 mm modern pr myslov vzory materi ly a komponenty vysok kvality chyty umo uj c instalaci pod stropem nebo uchycen na podlaze ve standardu pru n man ety a klapka transportn zabezpe en pru n ch man...

Page 44: ...na st n bokem rovnob n ke stropu Es ist unzul ssig die Flachger te CV P waagerecht an der Wand seitlich parallel zur Decke arbeiten zu lassen The work of CV P units installed horizontally on the wall...

Page 45: ...hrung R Right version R Wykonanie lewe L L Lev proveden L Linksausf hrung L Left version L Zasilanie ch odnic freonowych Nap jen freonov ch chladi Richtung der Luftstr mung Power supply or freon coole...

Page 46: ...grza ek Mno stv top spir l Siederzahl Ammount of little heaters Moc grza ki V kon spir ly Leistung des Sieders Power of little heaters Napi cie zasilania Nap t Speisespannung Voltage Mo liwe do uzyska...

Page 47: ...ection of CV P device Idea czenia uzwoje silnika P ipojen motoru Idee f r die Verbindung der Motorwickungen The principle of connecting motor windings Schemat po cze Schemata p ipojen Verbindungsschem...

Page 48: ...vozu Y p i nap t mezi f zemi 230V Stern Dreieck Anlauf bei Leiterspannung 230V Indirect start up Y at the phase to phase voltage 230V Prze cznik Y D Y D P ep na Y D Umschalter Y D Y D Switch TR JK T T...

Page 49: ...pacing of belt pulleys diameters A mm Dp dp s P rednica mniejszego ko a pr ez men ho kola Durchmesser des kleineren Rades Diameter of smaller wheel SPZ dp mm 56 95 100 140 13 20 20 25 1 3 2 0 2 5 3 6...

Reviews: