background image

— 6 —

TESTING THE GAS SUPPLY SYSTEM

When test pressures exceed 

1

/

2

 psig (3.45 kPa), the fryer and its individual shutoff valve must be

disconnected from the gas supply piping system.

When test pressures are 

1

/

psig (3.45 kPa) or less, the fryer must be isolated from the gas supply

system by closing its individual manual shutoff valve.

LEVELING THE FRYER

Once gas connections have been made, place a spirit level on top of the fryer.  Adjust the legs to
ensure that the fryer is level front-to-back and side-to-side in the final installed position.

FLUE CONNECTIONS

DO NOT

 obstruct the flow of flue gases from the flue located at the rear of the fryer.  It is

recommended that the flue gases be ventilated to the outside of the building through a ventilation
system installed by qualified personnel.

Adequate ventilation must be provided and must comply with NFPA Standard #96 (latest edition),
and with local codes.

Never make flue connections directly to the fryer.

The fryer must be located under a hood which has an adequate connection to an exhaust duct.  The
hood must extend 6" (152.4 mm) beyond fryer sides.

Clearance above fryer should be adequate for products of combustion to be removed efficiently.  An
18" (457 mm) minimum clearance should be maintained between the flue vent and the filters of the
hood venting system.

Information on the construction and installation of ventilating hoods may be obtained from the
standard for "Vapor Removal from Cooking Equipment," NFPA No. 96 (latest edition), available
from the National Fire Protection Association, Batterymarch Park, Quincy, MA 02269.

Adequate air should be provided in the kitchen to replace air taken out by the ventilating system.
This will prevent fryer function from being affected by a reduced atmospheric pressure.

Summary of Contents for EF SERIES

Page 1: ...W FOOD EQUIPMENT GROUP LLC WWW VULCANHART COM P O BOX 696 LOUISVILLE KY 40201 0696 TEL 502 778 2791 INSTALLATION OPERATION MANUAL For additional information on Vulcan Hart or to locate an authorized parts and service provider in your area visit our website at www vulcanhart com FORM 35640 02 05 MODEL EF3 ...

Page 2: ...IN THE EVENT A GAS ODOR IS DETECTED SHUT DOWN UNITS AT MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE WARNING IMPROPER INSTALLATION ADJUSTMENT ALTERATION SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE INJURY OR DEATH READ THE INSTALLAT...

Page 3: ...opane agrees with the specifications on the fryer data plate which is located on the inside of the door Also be sure the fryer is built for the installation elevation The fryer must be restrained with adequate ties to prevent tipping when installed in order to avoid the splashing of hot liquid UNPACKING This fryer was carefully inspected before leaving the factory The transportation company assume...

Page 4: ...ow of combustion and ventilation air Do not permit fans to blow directly at the fryer Wherever possible avoid open windows next to the sides or back of the fryer Avoid wall type fans which create air cross currents within the room INSTALLATION CODES AND STANDARDS Your Vulcan Fryer must be installed in accordance with In the United States of America 1 State and local codes 2 National Fuel Gas Code ...

Page 5: ...ning device to the rear of the fryer as shown in Fig 1 If it is necessary to disconnect the restraint turn off the gas supply before disconnection Reconnect the restraint before turning the gas supply on and returning the fryer to its installation position Instructions for installing casters to the fryer are included with the casters Fig 1 GAS CONNECTIONS CAUTION All gas supply connections and any...

Page 6: ...ed personnel Adequate ventilation must be provided and must comply with NFPA Standard 96 latest edition and with local codes Never make flue connections directly to the fryer The fryer must be located under a hood which has an adequate connection to an exhaust duct The hood must extend 6 152 4 mm beyond fryer sides Clearance above fryer should be adequate for products of combustion to be removed e...

Page 7: ... can be damaged Warpage can cause leaks Use only liquid shortening Fill fry tank to the oil level line on the back wall Fig 2 DO NOT melt solid shortening in the fry tank The fry tank will be damaged and the shortening will be scorched Do not overfill tank Keep shortening between the MIN and MAX lines in fry tank Add fresh shortening as needed MODEL EF3 Fig 2 OVER TEMPERATURE DEVICE If the shorten...

Page 8: ...epeat Steps 1 5 TURNING THE FRYER ON To turn the fryer on set the thermostat knob to the desired temperature After the set temperature has been reached the gas control shuts off gas flow to the burners The pilot remains lit The burners will cycle on and off maintaining the set temperature TURNING THE FRYER OFF 1 Turn the thermostat OFF 2 Turn the gas control valve knob so the I in PILOT is opposit...

Page 9: ...asket into the shortening to reduce batter build up on basket surfaces When frying is completed remove baskets or product Hang baskets on rear basket hangers Remove food and season it Do not salt food over the shortening because salt could cause a chemical change in the oil SHORTENING LIFE Shortening life may be extended by following these guidelines Do not salt foods over the fryer Use good quali...

Page 10: ...er is to drain the shortening from the drain pipe through a filter bag or cover the receiving container with cheesecloth or other filtering material Filtering Procedure 1 Turn the fryer OFF 2 Slowly remove the baskets especially if shortening is hot to prevent splashing 3 Open the fryer door and attach the drain pipe to the drain valve 4 Select a container of sufficient capacity and place it below...

Page 11: ...l cleaner following the manufacturer s instructions 3 Set the thermostat at a temperature recommended by the manufacturer of the commercial cleaner and boil the solution for 15 to 20 minutes Monitor boiling to prevent overflow 4 Drain the cleaning solution from the tank 5 Close the drain valve and refill the tank with water Add 1 cup 237 ml of vinegar to neutralize alkaline left by the cleaner Bri...

Page 12: ...UE Annually check the flue when it is cool to be sure it is free of obstructions SERVICE AND PARTS INFORMATION To obtain service and parts information contact the Vulcan Hart Service Agency in your area refer to our website www vulcanhart com for a complete listing of Authorized Service and Parts depots When calling for service the following information must be available Model number serial number...

Reviews: