1. Carefully coil the extra probe lead in the compressor compartment,
and secure it to the compartment wall with a tie wrap and tie wrap
anchor provided. Additional tie wraps and anchors may be used to
secure the probe lead to the exterior back wall of the freezer.
2. Loosen the terminal screws on the solenoid. Slide the spade lug
connectors under the screws and tighten to secure.
3. Connect power to the freezer. Turn the freezer On, with battery switch
Off (O).
a. The Solenoid Engaged light on the BUS control panel will
illuminate (no injection occurs). This light stays on until the unit
is below BUS setpoint.
b. The Low Battery indicator may also illuminate.
4. Turn the battery switch to Standby mode ( ) to charge both batteries.
The following section describes the configuration and operation of the
BUS.
Warning
When activated, this unit injects liquid nitrogen or carbon
dioxide. Liquid Nitrogen can cause serious freezing (frostbite) if it comes
in contact with unprotected skin or eyes. Nitrogen suppresses oxygen
levels and may cause suffocation if area is not well ventilated. Refer to
Appendix A for the proper handling of liquid LN
2
.
s
Caution
Adjust the pressure relief valve on any LN
2
tank to 30 PSI
maximum blow-off.
s
Warning
Carbon dioxide gas suppresses oxygen levels and may cause
suffocation if area is not well ventilated. Refer to “Handling Liquid CO
2
in
Appendix B of this manual.
s
5-4
ULT Freezer
VWR International
Section 5
Factory Installed Options
Connect Probe/Solenoid
Harness
BUS Control Panel
Summary of Contents for 5700 Series
Page 19: ......
Page 21: ......
Page 41: ......
Page 44: ...ULT Freezer 7 1 VWR International Section 7 Parts ...
Page 45: ...7 2 ULT Freezer VWR International Section 7 Parts ...
Page 46: ...ULT Freezer 7 3 VWR International Section 7 Parts ...
Page 59: ......
Page 60: ...ULT Freezer 8 1 VWR International Section 8 Refrigeration Schematics ULT Freezer 8 1 ...
Page 61: ...8 2 ULT Freezer VWR International Section 8 Refrigeration Schematics ...
Page 62: ...ULT Freezer 8 3 VWR International Section 8 Refrigeration Schematics ...
Page 63: ...8 4 ULT Freezer VWR International Section 8 Refrigeration Schematics ...
Page 64: ...ULT Freezer 8 5 VWR International Section 8 Refrigeration Schematics ...
Page 65: ......
Page 66: ...ULT Freezer 9 1 VWR International Section 9 Electrical Schematics ...
Page 67: ...9 2 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 68: ...ULT Freezer 9 3 VWR International Section 9 Electrical Schematics ...
Page 70: ...ULT Freezer 9 5 VWR International Section 9 Electrical Schematics ...
Page 71: ...9 6 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 72: ...ULT Freezer 9 7 VWR International Section 9 Electrical Schematics ...
Page 73: ...9 8 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 74: ...ULT Freezer 9 9 VWR International Section 9 Electrical Schematics ...
Page 75: ...9 10 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 76: ...ULT Freezer 9 11 VWR International Section 9 Electrical Schematics ...
Page 77: ...9 12 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 78: ...ULT Freezer 9 13 VWR International Section 9 Electrical Schematics ...
Page 79: ...9 14 ULT Freezer VWR International Section 9 Electrical Schematics ...
Page 80: ...ULT Freezer 9 15 VWR International Section 9 Electrical Schematics ...
Page 81: ......
Page 90: ...VWR International P O Box 5015 Bristol CT 06011 8960 ...