25
5.
Starting-up and maintenance
i
Fix the machine on a sturdy, level support
Use sharp processing tools
Adjust speed setting and feed to fit the material and diameter of the tool
Clamp the tools so that the clamping position is as near possible to the
workpiece
Clamp the workpieces fast and without vibrations.
Long pces. support with tailstock or with fixed stay.
Apply coolant and lubricant for better surface quality (finish) and
dimensional accuracy
Fix processing tools and workpieces on clean clamping surfaces
Grease the machine sufficiently
Use the correct tools for removing the material from the workpieces
Set correct bearing clearances and align guides early enough
6.
Overload protection
i
Wait approx. 1 second after switching off the machine manually or after an
automatic switchdown following an overload before you switch on again.
This will ensure that the motor is protected effectively in all work situations.
Otherwise it is possible that the machine will not come on because the
relay for the electronics has not been able to function.