Retain these instructions for future service and adjustments
615 South Street, Garden City, NY 11530
Tel: (516) 515-5000 Fax (516) 515-5050
www.waclighting.com
INSTRUCTIONS
: INVISILED™ PALETTE & AURA – 24V
Models Series
: LED-TC
CAUTION:
•
Read all instructions before installing.
•
Always turn off power at fuse box prior to installation to prevent electrical shock.
•
Intended for indoor use. Dry and damp locations.
•
For installation by a qualified electrician.
•
System is intended for installation in accordance with National Electric Code, and local regulations.
•
Consult with local inspector to assure compliance.
INVISILED™
Palette & Aura
Tape Lights have polarity for connection.
•
If a 1/2”x1/2” or greater cove or channel is not built-in, a Retrofit Channel may be necessary to conceal the tape
lights or provide an extended surface for mounting or directing the light.
Wiring and Installation:
Please refer to installation diagrams shown on next page.
1. Determine the number of separately powered runs needed. Calculate the number of power supplies.
Min. / max. run length
6 inch / 40 ft per run
Current
100 mA/ft
Power consumption
1.5 Watts/ft
2. Measure the length of each run and round it off to the nearest 6-inch interval. Determine the necessary
quantities of 1-ft, 5-ft.
3. Count the number of turns in the runs.
4. If making lateral turns at angles other than 90°, determine the number of joiner cables necessary to make
the lateral angles.
5. Connect the DC power supply to incoming 120V supply.
Hard Wire
•
DC power supply must be installed away from heat sources and accessible for service
•
Enclosed DC power supply is UL listed. The power supply box has a separate line volt, and
low volt wiring compartments. Trade size knock out are provided on both compartments.
Connect building wires to like color DC power supply wires with wire nuts. Building ground
wire my be green or un-insulated, and attaches to green wire from DC power supply box.
Portable
•
24 Volts DC power supply plugs into standard 120 Volts 3 prong grounded outlet
•
Power supply must be installed away from heat sources
•
Class II output splices do not require enclosures
6. Connect the output of the DC power supply with the WAC controller (refer to the picture in the next page),
then connect the 5 pins female connector of the controller to the 5 pins male connector of the InvisiLED
tape
,
to form straight lines or bend lengthwise around the installation surface;
7. Connect remaining sections using 1-ft and 5-ft sections of tape light or connectors.
6inch LED sections may
be cut where indicated at the end of the run only.
8. On smooth surfaces, the included adhesive is sufficient in most applications. However if mounting surface
is a porous or textured surface, then use a Mounting Clip every 6 inches to reinforce the installation.
9. Terminate each separately powered run with an end cap. Cut end caps or male end caps are the available
choices for cut or uncut sections respectively.