wc_tx001903gb.fm
54
Operation
E 1100
4.18
Unwinding and Positioning the Hoses
Requirements
HTF preheated if applicable
HTF flow initiated
Procedure
Follow the procedure below to unwind and position the hoses.
1. Rotate the T-Handle
(a)
counter-clockwise to unlock it.
:
2. Pull the hose
(b)
off the reel by hand and place it in the application area. See
topic
Hose Spacing Guidelines
for hose spacing recommendations based on
application.
Result
The hose is now positioned and the machine is operating.
NOTICE:
The machine must be periodically monitored during operation to ensure
system efficiency. See topic
Monitoring the Operating Parameters
.
CAUTION
Burn hazard. The hoses and components of the plumbing system may be very hot.
Hot hoses and hot plumbing components may cause severe burns.
f
Wear hand protection when handling hot hoses and plumbing components.
Summary of Contents for 5000620172
Page 19: ...E 1100 Safety Information wc_si000628gb fm 19 Notes ...
Page 20: ...Labels E 1100 20 wc_si000629gb fm 2 Labels 2 1 Label Locations wc_gr009588 ...
Page 105: ...ghi_tx001153gb fm 105 E 1100 Maintenance ...
Page 122: ...Technical Data E 1100 122 wc_td000476gb fm 10 5 Dimensions cm in wc_gr008706 ...
Page 133: ...wc_tx001673gb fm 133 Fuji Temperature Controller ...
Page 134: ...wc_tx001673gb fm 134 Fuji Temperature Controller ...
Page 151: ...E 1100 Schematics wc_tx001908gb fm 151 11 3 Burner System Circuit ...
Page 152: ...Schematics E 1100 152 wc_tx001908gb fm 11 4 Circulation System Circuit ghi_gr005662 ...
Page 153: ...E 1100 Schematics wc_tx001908gb fm 153 11 5 Rewind System Circuit ...
Page 158: ...Schematics E 1100 158 wc_tx001908gb fm 11 10 Genset DC Wiring Diagram ...
Page 160: ......
Page 161: ......