E 1100
Burner Setup
wc_tx001811gb.fm
79
Continued from the previous page.
When
Adjust the burner:
Before operating the machine at elevations 305 m (1,000 ft) above or below the
location of the previous adjustments
Before starting at a new job site
After any burner maintenance or repair has been performed
If burner performance is in question
Procedure
Follow the procedures below to set up the burner.
1. Shut down the machine.
2. Set the burner electrodes.
(See topic 6.1
Setting/Checking the Electrodes
.)
3. Check the burner nozzle.
(See topic 6.2
Checking/Replacing the Nozzle
)
4. Check/set the “Z” distance.
(See topic 6.3
Setting the “Z” Distance
.)
5. Set the air settings.
(See topic 6.4
Adjusting the Air Settings
)
6. Start the machine and the burner.
7. Check/set the fuel pressure.
(See topic 6.5
Setting the Fuel Pressure
)
8. Conduct a smoke spot test. Follow the smoke spot tester manufacturer’s
instructions and the general guidelines below.
Use the access hole in the exhaust stack.
Several samples should be taken as the heater warms.
The final sample should be taken just before the heater reaches 71°C (160°F).
This procedure continues on the next page.
Summary of Contents for 5000620172
Page 19: ...E 1100 Safety Information wc_si000628gb fm 19 Notes ...
Page 20: ...Labels E 1100 20 wc_si000629gb fm 2 Labels 2 1 Label Locations wc_gr009588 ...
Page 105: ...ghi_tx001153gb fm 105 E 1100 Maintenance ...
Page 122: ...Technical Data E 1100 122 wc_td000476gb fm 10 5 Dimensions cm in wc_gr008706 ...
Page 133: ...wc_tx001673gb fm 133 Fuji Temperature Controller ...
Page 134: ...wc_tx001673gb fm 134 Fuji Temperature Controller ...
Page 151: ...E 1100 Schematics wc_tx001908gb fm 151 11 3 Burner System Circuit ...
Page 152: ...Schematics E 1100 152 wc_tx001908gb fm 11 4 Circulation System Circuit ghi_gr005662 ...
Page 153: ...E 1100 Schematics wc_tx001908gb fm 153 11 5 Rewind System Circuit ...
Page 158: ...Schematics E 1100 158 wc_tx001908gb fm 11 10 Genset DC Wiring Diagram ...
Page 160: ......
Page 161: ......