BA 50Z3/6003 en – Edition 4.3 * 5003b340.fm
3-95
Operation
Boom swivel controls (from serial number AJ02777)
Swivelling the boom to the left:
☞
Unfold the hammer pedal cover
☞
Press and hold button A on the control lever
☞
Move hammer pedal
2
forward at the same time
Swivelling the boom to the right:
☞
Unfold the hammer pedal cover
☞
Press and hold button A on the control lever
☞
Move hammer pedal
2
backward at the same time
Right-hand control lever
Fig. 193: Swivel controls
A
2
Fig. 194: Right-hand control lever
H
G
E
F
Position
Lever
Function
E
Forward
Lowers the boom
F
To the right
Tilts out the bucket
G
Backward
Raises the boom
H
To the left
Tilts in the bucket
Fig. 195: Functions of right-hand control lever
H
J
I
Button
Function
H
Horn
I
Operates the 3rd control circuit
J
Operates the 3rd control circuit
Summary of Contents for 50Z3
Page 35: ...BA 50Z3 6003 en Edition 4 3 5003b110 fm 1 23 Introduction Overview of safety labels ...
Page 56: ...2 16 BA 50Z3 6003 en Edition 4 3 5003b210 fm Safety instructions ...
Page 178: ...3 122 BA 50Z3 6003 en Edition 4 3 5003b340 fm Operation ...
Page 190: ...4 12 BA 50Z3 6003 en Edition 4 3 5003b410 fm Troubleshooting ...
Page 254: ...5 64 BA 50Z3 6003 en Edition 4 3 5003b560 fm ...
Page 265: ...BA 50Z3 6003 en Edition 4 3 5003b610 fm 6 11 Specifications 6 16 Dimensions model 50Z3 ...
Page 267: ...BA 50Z3 6003 en Edition 4 3 5003b610 fm 6 13 Specifications 6 17 Dimensions model 50Z3 VDS ...