Commissioning
8.1 Power cable installation
22
Operator’s Manual | AR54-64 | 5100063562 | 02/2022 | [en-US]
8
Commissioning
8.1
Power cable installation
DANGER
Danger to life due to incorrect installation and initial start-up. Instal-
lation and initial commissioning is carried out exclusively by a ser-
vice partner or an electrician.
►
Errors during installation and initial start-up can lead to life-threaten-
ing situations and cause significant damage to property.
►
Complete installation and subsequent safety check is carried out ex-
clusively according to applicable guidelines.
1
2
3
4
5
6
1.
Unscrew screws
1
on the terminal box.
2.
Remove cover
2
, seal
3
and molded rubber part
4
.
3.
Feed the power cable
6
through the cable gland
5
and terminal box
hole, tightening torque 7.5 Nm.
4.
Screw the cable gland to the terminal box, tightening torque 3 Nm.
NOTICE
Machine damage due to incorrect connection.
When connecting two machines, make sure they rotate in opposite direc-
tions.